Discover the SciOpen Platform and Achieve Your Research Goals with Ease.
Search articles, authors, keywords, DOl and etc.
To obtain mechanical properties of bell and spigot joint under precast utility tunnel is sheared, a three-dimensional numerical model for soil and underground utility tunnel was established in this paper, the longitudinal uneven settlement of the utility tunnel segment was simulated by applying displacement, and the stress distribution law of the bell and spigot joint was obtained. Finally, the relationship between segmental settlement and joint shear loading capacity was established, and the ultimate settlement displacement of precast utility tunnel was obtained. The results show that: When the precast utility tunnel segment is sheared, the medial compression and lateral tension of the utility tunnel segment are caused. The stress at the spigot joint is distributed in the vertical side wall. The stress distribution in the bell roof and floor, the bearing end is mainly subjected to force on both sides of the top and bottom plate. The maximum principal stress of the bell joint is concentrated at the upper 1 m of the side wall, spigot the stress is concentrated in the bottom. The shear stress increases with the settlement increase under the parallel shear condition, while that decreases with the increase of displacement under reverse shear condition. the ultimate shear stress of the bell and spigot joint is 407 kN and 512 kN, The research results provide a scientific basis for the utility tunnel project engineering safe operation.
This is an open access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/).
Comments on this article