Study on the Mechanical Characteristics of Shallow Buried Four-Hole Tunnel with Small Distance through Expressway

Zhixiong Yao1,2,3( ), Yaoxing Liu2, Zhongxing Zhang4, Bo Wu5, Lei Ji2
Key Laboratory of Underground Engineering, Fujian University of Technology, Fuzhou 350118, P. R. China
Department of Civil Engineering, Fujian University of Technology, Fuzhou 350118, P. R. China
Fujian Provincial Key Laboratory of Advanced Technology and Informatization in Civil Engineering, Fuzhou 350118, P. R. China
China Railway 24th Bureau Group Fujian Railway Construction Co., Ltd., Fuzhou 351111, P. R. China
School of Civil and Architectural Engineering, East China University of Technology, Nanchang 330013, P. R. China
Show Author Information

Abstract

Based on the Mohr-Coulomb failure criterion and combined with mathematical optimization method, considering the key indexes such as the stress of surrounding rock, the deformation of cavern and the settlement of subgrade, the comprehensive evaluation equation of safety degree and the quantitative optimization scheme are established, and the mechanical characteristics of tunnel construction considering the construction process and support effect are studied. The intercalated rock between the first excavated right vehicular tunnel and the pedestrian tunnel produces strain penetration, the soil covering settlement of the vehicular tunnel is funnel-shaped, and the inverted arch bulges, and the plastic strain of the first excavated vehicular tunnel is mostly concentrated at the arch waist, while the arch crown subsidence and lateral deformation of the later excavated left vehicular tunnel are large. It can be seen that the unloading and stress release effect of the first excavated tunnel can not be ignored. During construction, attention should be paid to grouting reinforcement of the intercalated rock in the first excavated tunnel, and reinforcement measures such as foot locking anchor bolt and arch grouting should be set at the left arch foot of the two vehicular tunnels. When the upper bench is excavated, the vault settlement of the tunnel and the settlement of the overlying highway subgrade increase sharply, and the vault deformation at this stage exceeds 50% of the total deformation value. If the surrounding rock deteriorates or the environmental control standard is more strict, the short bench reserved core soil method or double side wall heading method should be considered. The settlement of the overlying subgrade of the tunnel presents an asymmetric "W" distribution, and the left vehicle tunnel behind is larger. The calculation results are verified by field monitoring data. There are stress concentration areas at the foot of pipe roof and the contact surface with surrounding rock, which reveals the stress transfer effect of pipe roof with larger stiffness. The installation of pipe shed can effectively slow down the vault settlement and subgrade settlement rate, ensure that the total settlement value of overlying subgrade is not more than 20 mm, and meet the design requirements. The research work provides better technical support and engineering guidance for similar projects.

CLC number: U451,U455 Document code: A Article ID: 1673-0836(2022)06-2052-10

References

【1】
【1】
 
 
Chinese Journal of Underground Space and Engineering
Pages 2052-2061

{{item.num}}

Comments on this article

Go to comment

< Back to all reports

Review Status: {{reviewData.commendedNum}} Commended , {{reviewData.revisionRequiredNum}} Revision Required , {{reviewData.notCommendedNum}} Not Commended Under Peer Review

Review Comment

Close
Close
Cite this article:
Yao Z, Liu Y, Zhang Z, et al. Study on the Mechanical Characteristics of Shallow Buried Four-Hole Tunnel with Small Distance through Expressway. Chinese Journal of Underground Space and Engineering, 2022, 18(6): 2052-2061. https://doi.org/10.20174/j.juse.2022.06.035

432

Views

2

Downloads

0

Crossref

0

Scopus

0

CSCD

Received: 03 August 2022
Published: 01 December 2022
© 2022 Chinese Journal of Underground Space and Engineering

This is an open access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/).