AI Chat Paper
Note: Please note that the following content is generated by AMiner AI. SciOpen does not take any responsibility related to this content.
{{lang === 'zh_CN' ? '文章概述' : 'Summary'}}
{{lang === 'en_US' ? '中' : 'Eng'}}
Chat more with AI
PDF (4.6 MB)
Collect
Submit Manuscript AI Chat Paper
Show Outline
Outline
Show full outline
Hide outline
Outline
Show full outline
Hide outline
Open Access

Study on Deformation Control Datum of High-Speed Railway Tunnel in Cohesive Loess Stratum

China Railway 4th Bureau Group Co., Ltd., Hefei 230000, P. R China
School of Civil Engineering, Southwest Jiaotong University, Chengdu 610031, P. R China
Key Laboratory of Transportation Tunnel Engineering, Ministry of Education, Southwest Jiaotong University, Chengdu 610031, P. R. China
Show Author Information

Abstract

Loess tunnel has the problems of shallow buried, large deformation during excavation and poor stability. When the loess tunnel passes through the existing buildings, it will bring great influences on the safety of the surface buildings, it’s in urgent need to ensure that the deformation in the excavation process chanegs within the scope specified in the specification. The deformation law of vault and ground surface in the process of high-speed railway tunnel excavation in clay loess stratum are analyzed. Combined with the analysis of field measured data, it is concluded that the settlement of tunnel in clay loess stratum is directly related to the buried depth and excavation method. There is a significant linear relationship between the surface settlement and the arch crown settlement under the same buried depth, and the ratio has little correlation with the construction method. The deformation control datum of high-speed railway tunnel construction in clay loess stratum is obtained based on the requirements of surface settlement control: Sv = [δ]/iH. It can be used as a reference for deformation control of similar projects.

CLC number: U25 Document code: A Article ID: 1673-0836(2022)03-0973-09

References

【1】
【1】
 
 
Chinese Journal of Underground Space and Engineering
Pages 973-981

{{item.num}}

Comments on this article

Go to comment

< Back to all reports

Review Status: {{reviewData.commendedNum}} Commended , {{reviewData.revisionRequiredNum}} Revision Required , {{reviewData.notCommendedNum}} Not Commended Under Peer Review

Review Comment

Close
Close
Cite this article:
Wang S, Feng J. Study on Deformation Control Datum of High-Speed Railway Tunnel in Cohesive Loess Stratum. Chinese Journal of Underground Space and Engineering, 2022, 18(3): 973-981. https://doi.org/10.20174/j.juse.2022.03.029

461

Views

2

Downloads

0

Crossref

0

Scopus

0

CSCD

Received: 26 September 2021
Published: 01 June 2022
© 2022 Chinese Journal of Underground Space and Engineering

This is an open access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/).