AI Chat Paper
Note: Please note that the following content is generated by AMiner AI. SciOpen does not take any responsibility related to this content.
{{lang === 'zh_CN' ? '文章概述' : 'Summary'}}
{{lang === 'en_US' ? '中' : 'Eng'}}
Chat more with AI
PDF (5.1 MB)
Collect
Submit Manuscript AI Chat Paper
Show Outline
Outline
Show full outline
Hide outline
Outline
Show full outline
Hide outline
Open Access

Physical Simulation Study on Dynamic Monitoring of Water Inrush from Concealed Fault in Confined Water

Jinshang Wang1( ), Duoxi Yao2
School of Civil Engineering Zhengzhou University of Technology, Zhengzhou 450044, P. R. China
College of Earth and Environment, Anhui University of Science and Technology, Huainan, Anhui 232001, P. R. China
Show Author Information

Abstract

In order to study the dynamic law of water inrush from floor crack expansion and hidden fault progressive uplift deeply, a fixed-point dynamic monitoring system for coal seam floor failure and progressive uplift coordinated water inrush was developed. The system consists of constant pressure pressurizing device, progressive uplift fixed-point quantitative observation device, uplift water quantitative acquisition device and stress detection system, which can directly realize the situation of coal seam floor failure and confined water progressive uplift at different positions of floor, and reveal the mechanism of collaborative water inrush from stope floor failure and progressive uplift and their temporal and spatial evolution law. The test results show that with the advancing of the working face, the progressive lifting process of hidden faults has experienced four stages: natural lifting stage, progressive lifting stage, enhanced lifting stage and penetration stage, which has an important relationship with the speed and scale of crack development of coal seam floor rock mass. When the peak value of mining stress unloading occurs, the progressive lifting degree is strengthened and the water volume increases, and the unloading degree of floor rock mass reaches the peak value synchronously with the progressive lifting intensity and the water output of dynamic monitoring pipe.

CLC number: TD745 Document code: A Article ID: 1673-0836(2022)02-0681-09

References

【1】
【1】
 
 
Chinese Journal of Underground Space and Engineering
Pages 681-689

{{item.num}}

Comments on this article

Go to comment

< Back to all reports

Review Status: {{reviewData.commendedNum}} Commended , {{reviewData.revisionRequiredNum}} Revision Required , {{reviewData.notCommendedNum}} Not Commended Under Peer Review

Review Comment

Close
Close
Cite this article:
Wang J, Yao D. Physical Simulation Study on Dynamic Monitoring of Water Inrush from Concealed Fault in Confined Water. Chinese Journal of Underground Space and Engineering, 2022, 18(2): 681-689. https://doi.org/10.20174/j.juse.2022.02.038

343

Views

1

Downloads

0

Crossref

0

Scopus

0

CSCD

Received: 22 September 2021
Published: 01 April 2022
© 2022 Chinese Journal of Underground Space and Engineering

This is an open access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/).