Study on Calculation Method of Shield Length and Thrust of TBM in Deep High Stress Tunnel

Yiqiang Lu1,2( ), Guang Li1
China Railway Engineering Equipment Group Co., Ltd., Zhengzhou 450016, P. R. China
College of Civil Engineering, Tongji University, Shanghai 200092, P. R. China
Show Author Information

Abstract

Rock tunnel boring machine (TBM) is a safe, fast and effective tunnel excavation equipment. However, TBM is prone to get stuck when TBM is excavating complex and high in-situ stress tunnels. Therefore the influence of geological environment should be considered as much as possible at the beginning of TBM design to reduce the risk of TBM sticking. By analyzing the influences of high stress conventional stratum and high stress soft and broken rock stratum on TBM, two criteria of TBM jamming in high stress conventional formation and high stress soft broken formation were proposed. According to the two criteria, the theoretical calculation method of shield length design and thrust design of high stress tunnel TBM considering surrounding rock mechanical parameters was proposed, and the basis of parameter selection was given. Finally, the rationality of the existing TBM design was calculated and analyzed based on actual surrounding rock geological parameters of a high stress tunnel in Southwest China. The study can provide basis for the design and calculation of shield length and thrust of TBM.

CLC number: U452.2 Document code: A Article ID: 1673-0836(2022)02-0577-09

References

【1】
【1】
 
 
Chinese Journal of Underground Space and Engineering
Pages 577-585

{{item.num}}

Comments on this article

Go to comment

< Back to all reports

Review Status: {{reviewData.commendedNum}} Commended , {{reviewData.revisionRequiredNum}} Revision Required , {{reviewData.notCommendedNum}} Not Commended Under Peer Review

Review Comment

Close
Close
Cite this article:
Lu Y, Li G. Study on Calculation Method of Shield Length and Thrust of TBM in Deep High Stress Tunnel. Chinese Journal of Underground Space and Engineering, 2022, 18(2): 577-585. https://doi.org/10.20174/j.juse.2022.02.026

679

Views

7

Downloads

0

Crossref

0

Scopus

0

CSCD

Received: 09 October 2021
Published: 01 April 2022
© 2022 Chinese Journal of Underground Space and Engineering

This is an open access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/).