AI Chat Paper
Note: Please note that the following content is generated by AMiner AI. SciOpen does not take any responsibility related to this content.
{{lang === 'zh_CN' ? '文章概述' : 'Summary'}}
{{lang === 'en_US' ? '中' : 'Eng'}}
Chat more with AI
PDF (4 MB)
Collect
Submit Manuscript AI Chat Paper
Show Outline
Outline
Show full outline
Hide outline
Outline
Show full outline
Hide outline
Open Access

A Geological Prediction System for Shield Construction Based on Focusing Frequency IP Method

Xiaolong Wei1, Junxiang Zheng2, Fulong Lin1, Yati Lu1( )
China Railway Engineering Equipment Group Co., Ltd., Zhengzhou, 450016
China Electronics Technology Group Corporation No. 22 Research Institute, Xinxiang, Heinan 453000
Show Author Information

Abstract

In view of the problem of excavation space closed and difficulty in geological prediction during shield construction, a method of advanced geological prediction based on focusing current method and frequency domain IP method is designed, which can realize transmission and effective reception of detection current under low power. In order to improve the measuring accuracy and stability, the current measuring coil is introduced to focus the current effectively, and the under-focusing and over-focusing problems are solved. In this paper, the principle and advantages of the focused current method and the frequency domain IP method are introduced. At the same time, a two-dimensional axisymmetric model of the 6 M class EPB shield machine is established, and the theoretical sounding depth is calculated. According to the geological prediction method studied in this paper, the system is specially designed for the EPB shield machine used for the No.08 of Dalian Metro Line 5 (Houyan Station-Houguan Village station) to realize the application of focused current method and frequency domain IP method in the shield machines and the real-time prediction in the construction process. Through the analysis of the prediction results and the continuous verification in the construction process, the method has basically achieved the expected goal and realized the accurate prediction of the unfavorable geological conditions in front of the tunnel face for many times, which makes it of great value for promotion and application.

CLC number: TU47 Document code: A Article ID: 1673-0836(2022)01-0290-07

References

【1】
【1】
 
 
Chinese Journal of Underground Space and Engineering
Pages 290-296

{{item.num}}

Comments on this article

Go to comment

< Back to all reports

Review Status: {{reviewData.commendedNum}} Commended , {{reviewData.revisionRequiredNum}} Revision Required , {{reviewData.notCommendedNum}} Not Commended Under Peer Review

Review Comment

Close
Close
Cite this article:
Wei X, Zheng J, Lin F, et al. A Geological Prediction System for Shield Construction Based on Focusing Frequency IP Method. Chinese Journal of Underground Space and Engineering, 2022, 18(1): 290-296. https://doi.org/10.20174/j.juse.2022.01.033

438

Views

2

Downloads

0

Crossref

0

Scopus

0

CSCD

Received: 06 August 2021
Published: 01 February 2022
© 2022 Chinese Journal of Underground Space and Engineering

This is an open access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/).