AI Chat Paper
Note: Please note that the following content is generated by AMiner AI. SciOpen does not take any responsibility related to this content.
{{lang === 'zh_CN' ? '文章概述' : 'Summary'}}
{{lang === 'en_US' ? '中' : 'Eng'}}
Chat more with AI
PDF (4.9 MB)
Collect
Submit Manuscript AI Chat Paper
Show Outline
Outline
Show full outline
Hide outline
Outline
Show full outline
Hide outline
Open Access

Full-Scale Loading Test on Ultimate Bearing Capacity of Shield Segment during Service Period

Jiaju Ran1Zhitian Xie1,2( )Xiaokai Niu1,2Jinpeng Guo3Lihong Song1,2
Beijing Municipal Engineering Research Institute, Beijing 100037, P. R. China
Beijing Key Laboratory of Underground Engineering Construction Prediction & Precaution, Beijing 100037, P. R. China
School of Civil Engineering, Beijing Jiaotong University, Beijing 100044, P. R. China
Show Author Information

Abstract

To investigate the ultimate bearing capacity of shield tunnel segments during service, a full-scale experimental investigation was conducted. Using three rings of service-aged segments as test subjects, the experimental testing content and loading scheme were formulated. The segments underwent three-stage loading to simulate static loading tests under overburden pressure, with monitoring of overall convergence deformation, joint misalignment, longitudinal joint opening, and segment cracks during the loading process. The stress distribution, failure modes, and ultimate bearing capacity of the middle ring segments were analyzed. The results indicate that under a simulated burial depth of 15 m, the overall structural deformation of the segments was minimal. The deformation of the segments was divided into three stages, with rapid increases in overall convergence deformation when the relative displacement between the crown and invert exceeded 2.83‰D. The failure cracks in the segments were primarily concentrated around the bolt holes and longitudinal joint edges.

CLC number: TU93 Document code: A Article ID: 1673-0836(2026)03-0813-09

References

【1】
【1】
 
 
Chinese Journal of Underground Space and Engineering
Pages 813-821

{{item.num}}

Comments on this article

Go to comment

< Back to all reports

Review Status: {{reviewData.commendedNum}} Commended , {{reviewData.revisionRequiredNum}} Revision Required , {{reviewData.notCommendedNum}} Not Commended Under Peer Review

Review Comment

Close
Close
Cite this article:
Ran J, Xie Z, Niu X, et al. Full-Scale Loading Test on Ultimate Bearing Capacity of Shield Segment during Service Period. Chinese Journal of Underground Space and Engineering, 2026, 22(3): 813-821. https://doi.org/10.20174/j.JUSE.2026.03.07

4

Views

0

Downloads

0

Crossref

0

Scopus

0

CSCD

Received: 13 September 2025
Published: 01 June 2026
© 2026 Chinese Journal of Underground Space and Engineering

This is an open access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/).