Open Access

Case Analysis of Shield Method Contact Channel Project in Rich Water Soft Soil Area

Xiaofan Li1Jianzheng Song2Yuming Zhang1Yanjie Song3Xuesong Cheng1,4( )
School of Civil Engineering, Tianjin University, Tianjin 300072, P. R. China
China Institute of Water Resources and Hydropower Research, Beijing 100038, P. R. China
China Railway Liuyuan Group Co., Ltd., Tianjin 300308, P. R. China
Key Laboratory of Coast Civil Structures and Safety of the Ministry of Education, Tianjin University, Tianjin 300072, P. R. China
Show Author Information

Abstract

In order to overcome the long distance difficulties of construction in the construction of the traditional freezing method and the influence of freezing, swelling and subsidence, based on the shield method contact channel of Tianjin Metro Line 10, the technical points and control methods of shield method construction of long-distance contact channel in Tianjin, as well as the influence on the surrounding environment, are analyzed and studied. The results show that: In the soft soil area of Tianjin, using measures such as the closed sleeve, micro-freezing reinforcement, steel plate ring beam, grouting plugging and reinforcement measures at the starting and receiving ends of the contact channel can strictly control and timely adjust the shield tunneling parameters, which can effectively prevent the risk of water leakage and sand leakage and reduce the impact on the main tunnel and the surrounding environment. The shield construction of the contact channel will lead to U-shaped settlement deformation of the upper soil along the tunnel axis direction. The settlement of the starting end is generally greater than the settlement of the receiving end, and the maximum settlement is about 10mm, which has little overall impact on the construction (structure). As the carrier of construction force in the main tunnel, the horizontal displacement of the main tunnel at the starting end is greater than that of the receiving end. The initial tunnel will present the convergent deformation of the horizontal ellipse and then the vertical ellipse, so the main tunnel at the initial section should be focused on.

CLC number: U455 Document code: A Article ID: 1673-0836(2026)01-0299-10

References

【1】
【1】
 
 
Chinese Journal of Underground Space and Engineering
Pages 299-308

{{item.num}}

Comments on this article

Go to comment

< Back to all reports

Review Status: {{reviewData.commendedNum}} Commended , {{reviewData.revisionRequiredNum}} Revision Required , {{reviewData.notCommendedNum}} Not Commended Under Peer Review

Review Comment

Close
Close
Cite this article:
Li X, Song J, Zhang Y, et al. Case Analysis of Shield Method Contact Channel Project in Rich Water Soft Soil Area. Chinese Journal of Underground Space and Engineering, 2026, 22(1): 299-308. https://doi.org/10.20174/j.JUSE.2026.01.31

344

Views

0

Downloads

0

Crossref

0

Scopus

0

CSCD

Received: 19 April 2025
Published: 01 February 2026
© 2026 Chinese Journal of Underground Space and Engineering

This is an open access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/).