AI Chat Paper
Note: Please note that the following content is generated by AMiner AI. SciOpen does not take any responsibility related to this content.
{{lang === 'zh_CN' ? '文章概述' : 'Summary'}}
{{lang === 'en_US' ? '中' : 'Eng'}}
Chat more with AI
PDF (6.1 MB)
Collect
Submit Manuscript AI Chat Paper
Show Outline
Outline
Show full outline
Hide outline
Outline
Show full outline
Hide outline
Open Access

Testing Method for Existing Engineering Pile Behavior Based on Side Hole Shear Waves

School of Digital Construction, Shanghai Urban Construction Vocational College, Shanghai 201415, P. R. China
Department of Civil Engineering, Shanghai Jiao Tong University, Shanghai 200240, P. R. China
Show Author Information

Abstract

For solving the difficulties in the bottom depth and integrity evaluation of existing piles, a parallel seismic (PS) test in existing research is proposed. The existing PS testing of using the first arrival of P wave transmitted from the pile shaft to evaluate the bottom depth and integrity is invalid in saturated soil, as it is difficult to excite the pile shaft with inaccessible pile tops in vertical direction. This paper is to provide a PS testing approach using the shear wave induced by horizontal impact on the lateral surface of a pile. Under appropriate excitation-testing hole arrangement in PS testing, the first arrival of shear wave (F-S wave) received at a certain depth of testing hole transmitted from the pile shaft, can be used to evaluate the bottom depth and integrity of existing piles in saturated soil. Finite element method is used to verify PS testing limitations of the first arrivals of P wave and the effectiveness of the first arrivals of shear wave in evaluating pile bottom and integrity for existing piles by horizontal impact on the lateral surface of a pile in saturated soil. The results show that: (1) When the testing holes are arranged perpendicular to the excitation direction in saturated soil, the first arrival of F-S wave in the received signal can be identified easily. By reading the first F-S wave travel time, the two fitting lines and their intersection points are determined and the intersection points are corrected by the recommended method, so as to determine the pile bottom depth more easily with higher precision. When there is a segregation defect in the pile body, the first F-S wave arrivals present a broken line consisting of two parallel lines and a connecting line in between. It is recommended that the depth of the top of the defect can be estimated based on the beginning point of the connecting line. The proposed PS testing method provides an effective means for evaluating the depth of pile bottom and the integrity of pile body in saturated foundation.

CLC number: TU4 Document code: A Article ID: 1673-0836(2025)增1-0396-07

References

【1】
【1】
 
 
Chinese Journal of Underground Space and Engineering
Pages 396-402

{{item.num}}

Comments on this article

Go to comment

< Back to all reports

Review Status: {{reviewData.commendedNum}} Commended , {{reviewData.revisionRequiredNum}} Revision Required , {{reviewData.notCommendedNum}} Not Commended Under Peer Review

Review Comment

Close
Close
Cite this article:
Zhang J. Testing Method for Existing Engineering Pile Behavior Based on Side Hole Shear Waves. Chinese Journal of Underground Space and Engineering, 2025, 21(S1): 396-402. https://doi.org/10.20174/j.JUSE.2025.S1.46

463

Views

1

Downloads

0

Crossref

0

Scopus

0

CSCD

Received: 18 December 2024
Published: 01 August 2025
© 2025 Chinese Journal of Underground Space and Engineering

This is an open access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/).