AI Chat Paper
Note: Please note that the following content is generated by AMiner AI. SciOpen does not take any responsibility related to this content.
{{lang === 'zh_CN' ? '文章概述' : 'Summary'}}
{{lang === 'en_US' ? '中' : 'Eng'}}
Chat more with AI
PDF (4.3 MB)
Collect
Submit Manuscript AI Chat Paper
Show Outline
Outline
Show full outline
Hide outline
Outline
Show full outline
Hide outline
Open Access

Study on Temporal Changing Regulations and Evolution Model of Surrounding Rock Disturbance in Subway Tunnel

Wentao Liu1, Lie Zhang1, Shuxiang Zhang1, Bo Zhang1, Bocao Yang2( )
No. Three Engineering Co, Ltd. of CCCC First Highway Engineering Co., Ltd., Beijing 100020, P. R. China
Chongqing Jiaotong University, College of Civil Engineering, Chongqing 400071, P. R. China
Show Author Information

Abstract

To deeply investigate the temporal changes of surrounding rock disturbance in the construction process of subway tunnel, the finite element numerical simulation was conducted to analyse the stress and strain changes induced by excavation, and the comparison of crown settlements at different excavation stages was performed, and then the displacement and stress state of surrounding rock during the excavation process was summarized. The evolution model for surrounding rock disturbance was proposed and validated by integrating wavelet analysis with the auto-regressive integrated moving average (ARIMA) model. The results indicate that: With tunnel excavation progresses, the stress distribution in the surrounding rock undergoes significant reorganization. Stress concentrations are particularly evident after initial support installation, especially following the completion of upper bench excavation. However, employing a stepwise excavation strategy with enlarged arch foot benches effectively reduces the scope of surrounding rock stress and stress concentration phenomena, thereby minimizing the impact of stress and strain changes on surrounding rock stability during excavation. Furthermore, the evolutionary model based on the W-ARIMA method successfully captures the overall dynamic changes of tunnel deformation. These findings can provide a new perspective and methodology for surrounding rock stability management in tunnel construction.

CLC number: U45 Document code: A Article ID: 1673-0836(2025)增1-0268-09

References

【1】
【1】
 
 
Chinese Journal of Underground Space and Engineering
Pages 268-276

{{item.num}}

Comments on this article

Go to comment

< Back to all reports

Review Status: {{reviewData.commendedNum}} Commended , {{reviewData.revisionRequiredNum}} Revision Required , {{reviewData.notCommendedNum}} Not Commended Under Peer Review

Review Comment

Close
Close
Cite this article:
Liu W, Zhang L, Zhang S, et al. Study on Temporal Changing Regulations and Evolution Model of Surrounding Rock Disturbance in Subway Tunnel. Chinese Journal of Underground Space and Engineering, 2025, 21(S1): 268-276. https://doi.org/10.20174/j.JUSE.2025.S1.32

398

Views

0

Downloads

0

Crossref

0

Scopus

0

CSCD

Received: 16 March 2025
Published: 01 August 2025
© 2025 Chinese Journal of Underground Space and Engineering

This is an open access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/).