Prediction of Foundation Settlement of Transmission Line Tower Due to Sheild Tunnels Excavation

Jun Zhang1, Chuanfeng Zeng2, Jianming Liang1, Peiyuan Lin3,4( ), Baosong Ma3,4
Foshan Power Supply Bureau, Foshan, Guangdong 528000, P. R. China
Foshan Electric Power Design Institute Co., Ltd., Foshan, Guangdong 528000, P. R. China
National Key Laboratory for Disaster Prevention and Control and Intelligent Construction & Maintenance of Tunnel Engineering, Sun Yat-Sen University, Guangzhou 510275, P. R. China
School of Civil Engineering, Sun Yat-Sen University, Guangzhou 510275, P. R. China
Show Author Information

Abstract

Tunnel boring is a common construction method for urban subway tunnel excavation. However, the tunnel boring process can easily induce ground and nearby building foundation deformations. Electrical transmission towers are crucial infrastructure for urban power supply, and when tunnel boring approaches these towers, an assessment of induced tower foundation settlement should be carried out. The finite element method is a powerful tool for conducting such assessments. However, due to the complexity of the geology and construction conditions, in regions lacking engineering experience and field data, finite element predictions often exhibit significant errors and are challenging to correct. In light of these challenges, this paper proposes a correction method for the finite element prediction model of tower foundation settlement near shield tunnel excavation based on the principle of similarity between ground and foundation settlement in the same finite element model. This method first utilizes pre-measured ground settlement data to determine the expression for its finite element model factor and then introduces it as a correction term into the tower foundation settlement prediction model. The empirical constants in the correction term are updated in real-time using actual tower foundation settlement data obtained during the tunnel boring process, leading to dynamic adjustments and improved accuracy in the prediction model. Using a shield tunnel project in Foshan, Guangdong as an example, this paper validates the superiority and practical value of the proposed method. The research indicates that: Without correction, the finite element model of the tower foundation overestimated its settlement by approximately 30%, with moderate accuracy and variability in predictions. Additionally, the predicted tower inclination based on settlement data did not align with the measured values. After applying the calibration method proposed in this paper, the overall accuracy of the tower foundation finite element model became unbiased, with reduced variability. The inclination of the tower, calculated based on the calibrated settlement data, exhibited high congruence with the measured values and consistent trends.

CLC number: U455.43 Document code: A Article ID: 1673-0836(2025)05-1752-11

References

【1】
【1】
 
 
Chinese Journal of Underground Space and Engineering
Pages 1752-1762

{{item.num}}

Comments on this article

Go to comment

< Back to all reports

Review Status: {{reviewData.commendedNum}} Commended , {{reviewData.revisionRequiredNum}} Revision Required , {{reviewData.notCommendedNum}} Not Commended Under Peer Review

Review Comment

Close
Close
Cite this article:
Zhang J, Zeng C, Liang J, et al. Prediction of Foundation Settlement of Transmission Line Tower Due to Sheild Tunnels Excavation. Chinese Journal of Underground Space and Engineering, 2025, 21(5): 1752-1762. https://doi.org/10.20174/j.JUSE.2025.05.31

917

Views

5

Downloads

0

Crossref

0

Scopus

0

CSCD

Received: 03 November 2024
Published: 01 October 2025
© 2025 Chinese Journal of Underground Space and Engineering

This is an open access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/).