AI Chat Paper
Note: Please note that the following content is generated by AMiner AI. SciOpen does not take any responsibility related to this content.
{{lang === 'zh_CN' ? '文章概述' : 'Summary'}}
{{lang === 'en_US' ? '中' : 'Eng'}}
Chat more with AI
PDF (2.7 MB)
Collect
Submit Manuscript AI Chat Paper
Show Outline
Outline
Show full outline
Hide outline
Outline
Show full outline
Hide outline
Open Access

Experimental Study on the Enlarged Head Pumping and Drainage Model of Static Drilling Rooted Pile

Shan Yu1,2, Yuebao Deng1,2( ), Shuhao Hu1,2, Rongyue Zheng1,2, Rihong Zhang3
Collaborative Innovation Center of Coastal Urban Rail Transit, Ningbo University, Ningbo, Zhejiang 315211, P. R. China
Ningbo Key Laboratory of Energy Structure Underground, Ningbo University, Ningbo, Zhejiang 315211, P. R. China
Ningbo Zhongchun Hi-Tech Co., Ltd., Ningbo, Zhejiang 315145, P. R. China
Show Author Information

Abstract

Static drilling and rooted pile is a green and environmentally friendly pile foundation construction method, which is mainly composed of PHC pipe pile and cement soil around the pile, and the expansion head treatment is added near the pile end. In order to accelerate and enhance the solidification of cement soil at the head of static drilling pile and further enhance the bearing capacity of pile foundation, the technology of vertical drainage channel and vacuum negative pressure drainage at the expanding head of pile end is proposed. Model tests were carried out to compare the bearing capacity of static drilling pile and static drilling pile with extended head pumping and drainage. The test results show that: The vacuum negative pressure drainage can accelerate the hardening of soil-cement around the enlarged head pile and make it reach the final strength earlier than the traditional static drilling pile. Vacuum negative pressure drainage consolidation strengthens the soil around the pile and the soil at the end of the pile to a certain extent. The ultimate bearing capacity of the enlarged head drainage pile at 28 days of pile formation is about 59% higher than that of the ordinary pile.

CLC number: TU473;TU476 Document code: A Article ID: 1673-0836(2025)05-1621-08

References

【1】
【1】
 
 
Chinese Journal of Underground Space and Engineering
Pages 1621-1628

{{item.num}}

Comments on this article

Go to comment

< Back to all reports

Review Status: {{reviewData.commendedNum}} Commended , {{reviewData.revisionRequiredNum}} Revision Required , {{reviewData.notCommendedNum}} Not Commended Under Peer Review

Review Comment

Close
Close
Cite this article:
Yu S, Deng Y, Hu S, et al. Experimental Study on the Enlarged Head Pumping and Drainage Model of Static Drilling Rooted Pile. Chinese Journal of Underground Space and Engineering, 2025, 21(5): 1621-1628. https://doi.org/10.20174/j.JUSE.2025.05.16

761

Views

0

Downloads

0

Crossref

0

Scopus

0

CSCD

Received: 18 December 2024
Published: 01 October 2025
© 2025 Chinese Journal of Underground Space and Engineering

This is an open access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/).