AI Chat Paper
Note: Please note that the following content is generated by AMiner AI. SciOpen does not take any responsibility related to this content.
{{lang === 'zh_CN' ? '文章概述' : 'Summary'}}
{{lang === 'en_US' ? '中' : 'Eng'}}
Chat more with AI
PDF (2.1 MB)
Collect
Submit Manuscript AI Chat Paper
Show Outline
Outline
Show full outline
Hide outline
Outline
Show full outline
Hide outline
Open Access

Study on Precise Delay Time Technology and Application of V-Cut Blasting in Tunnel Excavation

Yu Hu1, Genzhong Wang2, Min Zhou2, Wenxue Gao1( ), Xiaojun Zhang1
College of Architecture and Civil Engineering, Beijing University of Technology, Beijing 100124, P. R. China
Zhejiang Lihua Blasting Engineering Co., Ltd., Lishui, Zhejiang 323300, P. R. China
Show Author Information

Abstract

To reduce the vibration intensity of wedge-shape excavation blasting in tunnel, the precisely controlled delay time technology of tunnel V-cut blasting was proposed based on the Mohr-Coulomb strength criterion, the maximum tensile stress, and Anderson superposition theory. Firstly, the mechanism of segmental blasting of V-cut is revealed through theoretical analysis. Secondly, the function of blasting vibration waves was obtained by fitting the Gauss function. Finally, the precise delay time of reducing blasting vibration was obtained by superimposing different delay times with Matlab. The results show that: The stepped V-cut blasting improves the free surface conditions of blasting, and weakens the vibration propagation energy by reducing the amount of blasting charge in a single stage. Based on the Qi Jiazhuang tunnel of National Highway 109, the vibration strength of V-cut blasting was reduced by about 60% when the delay time was 13 ms. The engineering practice showed that the relative error between the theory and the field monitoring data was 13.9%, which verified the validity of the technology.

CLC number: U455.6 Document code: A Article ID: 1673-0836(2025)03-1050-07

References

【1】
【1】
 
 
Chinese Journal of Underground Space and Engineering
Pages 1050-1056

{{item.num}}

Comments on this article

Go to comment

< Back to all reports

Review Status: {{reviewData.commendedNum}} Commended , {{reviewData.revisionRequiredNum}} Revision Required , {{reviewData.notCommendedNum}} Not Commended Under Peer Review

Review Comment

Close
Close
Cite this article:
Hu Y, Wang G, Zhou M, et al. Study on Precise Delay Time Technology and Application of V-Cut Blasting in Tunnel Excavation. Chinese Journal of Underground Space and Engineering, 2025, 21(3): 1050-1056. https://doi.org/10.20174/j.JUSE.2025.03.34

773

Views

1

Downloads

0

Crossref

1

Scopus

1

CSCD

Received: 08 August 2024
Published: 01 June 2025
© 2025 Chinese Journal of Underground Space and Engineering

This is an open access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/).