AI Chat Paper
Note: Please note that the following content is generated by AMiner AI. SciOpen does not take any responsibility related to this content.
{{lang === 'zh_CN' ? '文章概述' : 'Summary'}}
{{lang === 'en_US' ? '中' : 'Eng'}}
Chat more with AI
PDF (2.4 MB)
Collect
Submit Manuscript AI Chat Paper
Show Outline
Outline
Show full outline
Hide outline
Outline
Show full outline
Hide outline
Open Access

Research on Calculation Method of Segment Floating during Construction of Shield Tunnel

Junneng Ye1, Yongting Ban1, Xiaowei Ye2,3( ), Xiaolong Zhang3, Ke Song3
Ningbo Rail Transit Group Co., Ltd, Ningbo, Zhejiang 315101, P.R. China
Key Laboratory of Soft Soils and Geoenvironmental Engineering, Ministry of Education, Zhejiang University, Hangzhou 310058, P.R. China
Institute of Geotechnical Engineering, Zhejiang University, Hangzhou 310058, P.R. China
Show Author Information

Abstract

Shield tunneling method is widely used in subway tunnel construction because of its advantages such as not affecting ground traffic, high mechanization degree and short construction period. However, the problems of cracking and damage caused by uneven rising of segments are often encountered in the construction process of shield method, which affects the normal use of tunnel. However, the research on the mechanism and theoretical calculation of shield tunnel segment floating is relatively rare. In this paper, the floating mechanism of segments in the initial floating stage of shield tunnel is analyzed deeply, and the corresponding theoretical calculation formulas of upward buoyancy/anti-buoyancy and buoyancy are proposed. The theoretical calculation results are compared and analyzed with engineering examples. The results show that: The initial floating of the segment can be divided into two stages: rapid rising and slow rising, in which the rising amount of the rapid rising stage accounts for about 80%~90% of the total rising amount. The theoretical calculation value of the total floating amount is greater than the monitoring value, but the calculation error of the floating amount per ring is relatively stable, the theoretical calculation formula presented in this paper can provide reference for the calculation of the floating amount of the actual segment.

CLC number: U45 Document code: A Article ID: 1673-0836(2025)03-0816-08

References

【1】
【1】
 
 
Chinese Journal of Underground Space and Engineering
Pages 816-823

{{item.num}}

Comments on this article

Go to comment

< Back to all reports

Review Status: {{reviewData.commendedNum}} Commended , {{reviewData.revisionRequiredNum}} Revision Required , {{reviewData.notCommendedNum}} Not Commended Under Peer Review

Review Comment

Close
Close
Cite this article:
Ye J, Ban Y, Ye X, et al. Research on Calculation Method of Segment Floating during Construction of Shield Tunnel. Chinese Journal of Underground Space and Engineering, 2025, 21(3): 816-823. https://doi.org/10.20174/j.JUSE.2025.03.09

715

Views

2

Downloads

0

Crossref

2

Scopus

1

CSCD

Received: 26 September 2024
Published: 01 June 2025
© 2025 Chinese Journal of Underground Space and Engineering

This is an open access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/).