AI Chat Paper
Note: Please note that the following content is generated by AMiner AI. SciOpen does not take any responsibility related to this content.
{{lang === 'zh_CN' ? '文章概述' : 'Summary'}}
{{lang === 'en_US' ? '中' : 'Eng'}}
Chat more with AI
PDF (4 MB)
Collect
Submit Manuscript AI Chat Paper
Show Outline
Outline
Show full outline
Hide outline
Outline
Show full outline
Hide outline
Open Access

Study on the Response Characteristics of Tunnel Crossing Active Faults of the Yellow River to Xining Water Diversion Project

Jihua Yang1( ), Zhen Cui2, Weifeng Wan1, Zhenhong Liu1, Weixin Guo1
Yellow River Engineering Consulting Co., Ltd, Zhengzhou 450003, P. R. China
Institute of Rock and Soil Mechanics, Chinese Academy of Sciences, Wuhan 430071, P. R. China
Show Author Information

Abstract

The Yellow River to Xining water diversion project tunnel in Qinghai province has a total length of 74.4km and cross four regional active faults. Ensuring the safety when tunnel crossing active faults is one of the key issues faced by the Yellow River to Xining water diversion project. Aiming at the above issues, firstly, a thematic research method was adopted to propose the basic parameters of each active fault, providing a basis for targeted design. Secondly, taking the northern edge fault (F2) of the Nanshan Mountains in Qinghai Province as an example, an elastic-plastic analysis model for tunnel crossing active faults was established using numerical simulation methods to study the response characteristics of the integral and hinged lining under different displacement. The results showed that under the condition of integral lining, the deformation, lining stress, and internal force of the tunnel increase with the increase of displacement. The deformation of the left and right side walls, the maximum tensile stress of the lining, and the maximum shear force appear at the center of the fault zone, while the deformation of the arch top and bottom plate, and the maximum bending moment of the lining appear at the intersection of the fault zone; Under the condition of hinged lining, the longitudinal stress, equivalent axial force, bending moment, and shear force in different parts of the tunnel do not show a significant increase in the maximum stress and internal force with the increase of displacement after reaching 30cm. The deformation mainly occurs at the hinge joint, effectively improving the stress state of the lining under displacement conditions. Finally, the next research direction for the Yellow River to Xining water diversion project tunnel crossing active faults is proposed.

CLC number: TV221 Document code: A Article ID: 1673-0836(2025)01-0283-10

References

【1】
【1】
 
 
Chinese Journal of Underground Space and Engineering
Pages 283-292

{{item.num}}

Comments on this article

Go to comment

< Back to all reports

Review Status: {{reviewData.commendedNum}} Commended , {{reviewData.revisionRequiredNum}} Revision Required , {{reviewData.notCommendedNum}} Not Commended Under Peer Review

Review Comment

Close
Close
Cite this article:
Yang J, Cui Z, Wan W, et al. Study on the Response Characteristics of Tunnel Crossing Active Faults of the Yellow River to Xining Water Diversion Project. Chinese Journal of Underground Space and Engineering, 2025, 21(1): 283-292. https://doi.org/10.20174/j.JUSE.2025.01.31

699

Views

1

Downloads

0

Crossref

1

Scopus

1

CSCD

Received: 07 May 2024
Published: 01 February 2025
© 2025 Chinese Journal of Underground Space and Engineering

This is an open access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/).