Boundary Estimation of Tunnel Surrounding Rock Engineering Based on Mohr-Coulomb Criterion

Ya Su1( ), Yonghua Su2, Zhongxuan Yang1
Department of Civil Engineering, Zhejiang University, Hangzhou 310058, P. R. China
Department of Civil Engineering, Hunan University, Changsha 410082, P. R. China
Show Author Information

Abstract

In numerical modelling of tunnelling, the size of the numerical model, representing the range of engineering boundary for tunnel surrounding rock, is of great significance for tunnel stability analysis and design. Based on Mohr-Coulomb criterion, an estimation method was proposed for the engineering boundary range of tunnel surrounding rock considering rock mass quality, taking rock stress disturbance amplitude as a quantitative indicator. Rock masse of four quality levels were utilized to validate the estimation method. The results show that: The estimation method can be used to quickly predict the engineering boundary range for rock masses of different qualities, in which the estimation results for rock mass grade Ⅲ and Ⅳ are highly closed to the numerical results. Furthermore, the impacts of lateral pressure coefficient and excavation shape on the engineering boundary range were investigated. The results indicate the lateral pressure coefficient has an obvious effect while the excavation shape has a negligible one. This proposed estimation method provides advice for the accuracy of the numerical modelling design and analysis in underground tunnels.

CLC number: U451 Document code: A Article ID: 1673-0836(2025)01-0052-09

References

【1】
【1】
 
 
Chinese Journal of Underground Space and Engineering
Pages 52-60

{{item.num}}

Comments on this article

Go to comment

< Back to all reports

Review Status: {{reviewData.commendedNum}} Commended , {{reviewData.revisionRequiredNum}} Revision Required , {{reviewData.notCommendedNum}} Not Commended Under Peer Review

Review Comment

Close
Close
Cite this article:
Su Y, Su Y, Yang Z. Boundary Estimation of Tunnel Surrounding Rock Engineering Based on Mohr-Coulomb Criterion. Chinese Journal of Underground Space and Engineering, 2025, 21(1): 52-60. https://doi.org/10.20174/j.JUSE.2025.01.06

601

Views

4

Downloads

0

Crossref

0

Scopus

0

CSCD

Received: 13 May 2024
Published: 01 February 2025
© 2025 Chinese Journal of Underground Space and Engineering

This is an open access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/).