AI Chat Paper
Note: Please note that the following content is generated by AMiner AI. SciOpen does not take any responsibility related to this content.
{{lang === 'zh_CN' ? '文章概述' : 'Summary'}}
{{lang === 'en_US' ? '中' : 'Eng'}}
Chat more with AI
PDF (8.2 MB)
Collect
Submit Manuscript AI Chat Paper
Show Outline
Outline
Show full outline
Hide outline
Outline
Show full outline
Hide outline
Open Access

Research on TBM Jamming Technology in Weak Fracture Zone of Tunnel

Likun Liu1, Mingsheng Wang1,2( ), Junfu Lu1, Zhihao Miao1, Qingjun Zheng3
State Key Laboratory of Geohazard Prevention and Geoenvironment Protection, Chengdu University of Technology, Chengdu 610059, P. R. China
China Railway City Development and Investment Group Co., Ltd., Chengdu 610000, P. R. China
China Railway Tunnel Co., Ltd., Zhengzhou 450003, P. R. China
Show Author Information

Abstract

A tunnel is affected by the poor geology of the weak fracture zone. During TBM tunneling, problems such as poor self-stability of surrounding rock, easy collapse, and accumulation of slag accumulation occur, resulting in the shield being locked or the cutter head being stuck. To get the TBM out of trouble, the small pilot tunnel construction technology is proposed to carry out new technology of the small pilot tunnel construction from the top of the TBM shield, and the method of long-distance horizontal reinforcement of the bad geology in front of the tunnel face and the cleaning of the slag around the cutter head and shield body is carried out so that the TBM can be smoothly promoted. Under the condition of long and large fault fracture zones, the half-section method construction technology of upper-section excavation and TBM tunneling is proposed to solve the risk of frequent TBM jamming and tunnel collapse. The results show that the construction technology of a small pilot tunnel has the advantages of reducing the risk of jamming, realizing the horizontal advance reinforcement of surrounding rock in front of TBM, shortening the construction period, saving cost and construction.

CLC number: U25 Document code: A Article ID: 1673-0836(2024)06-2064-10

References

【1】
【1】
 
 
Chinese Journal of Underground Space and Engineering
Pages 2064-2073

{{item.num}}

Comments on this article

Go to comment

< Back to all reports

Review Status: {{reviewData.commendedNum}} Commended , {{reviewData.revisionRequiredNum}} Revision Required , {{reviewData.notCommendedNum}} Not Commended Under Peer Review

Review Comment

Close
Close
Cite this article:
Liu L, Wang M, Lu J, et al. Research on TBM Jamming Technology in Weak Fracture Zone of Tunnel. Chinese Journal of Underground Space and Engineering, 2024, 20(6): 2064-2073. https://doi.org/10.20174/j.JUSE.2024.06.32

839

Views

6

Downloads

0

Crossref

4

Scopus

3

CSCD

Received: 28 March 2024
Published: 01 December 2024
© 2024 Chinese Journal of Underground Space and Engineering

This is an open access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/).