AI Chat Paper
Note: Please note that the following content is generated by AMiner AI. SciOpen does not take any responsibility related to this content.
{{lang === 'zh_CN' ? '文章概述' : 'Summary'}}
{{lang === 'en_US' ? '中' : 'Eng'}}
Chat more with AI
PDF (8.7 MB)
Collect
Submit Manuscript AI Chat Paper
Show Outline
Outline
Show full outline
Hide outline
Outline
Show full outline
Hide outline
Open Access

Test Research of Ultra Deep Special-Shaped Diaphragm Wall with Rigid Joint of Row Inserted Mesh Reinforcement

Huan Xia1,2( ), Xutao Zeng1,3, Jinlei Fu1,2, Juntao Zhu1,3, Cheng Qu1,2
CCCC Second Harbour Engineering Co., Ltd., Wuhan 430014, P. R. China
The 4th Engineering Company, CCCC Second Harbor Engineering Co., Ltd., Wuhu, Anhui 241001, P. R. China
Key Laboratory of Construction Technology of Long Span Bridges, Transportation Industry, Wuhan 430014, P. R. China
Show Author Information

Abstract

Based on the field process test of the south anchorage foundation of Zhangjinggao Yangtze River Bridge, the key technology in the construction of ultra deep special-shaped grid joint diaphragm wall was innovated and verified. The results show that: The combined construction process of trench cutter and hydraulic grab can ensure the verticality of the ultrasonic irregular groove section and the stability of the groove wall by reasonable setting construction sequence, introducing virtual collision detection technology for slot segments based on composite detection methods and extended guide frame and strengthening mud performance control and other control measures, the verticality and stability of ultra deep special-shaped panel trench can be ensured. The inclinometer and three-dimensional hydraulic jack are used to adjust the posture of the rigid joint, and the guide device is used to assist the rigid joint to enter the trench, so that the precision can be measured and controlled during the installation of the rigid joint. Intelligent synchronous welding technology can effectively control welding deformation and optimize welding quality. The relative position relationship between rigid joints and reinforcement cages can be effectively controlled on the basis of matching fabrication of reinforcement cages, supplemented by verticality monitoring means. The special wall brushing device is used to clean up the sludge at the row inserted reinforcement, and the synchronous pouring platform is used to realize the synchronous pouring of each compartment of the rigid joint, which is conducive to the improvement of the pouring quality and the structural safety control of the joint. The concrete bypass channel can be blocked with anti flowing water tape, which can effectively prevent the concrete from polluting the rebar at the joint and ensure the strength and integrity of the diaphragm wall. Later excavation tests have verified that the construction control measures proposed in this article can effectively ensure the quality of the diaphragm wall and the bearing capacity of the joints.

CLC number: U443 Document code: A Article ID: 1673-0836(2024)06-2020-14

References

【1】
【1】
 
 
Chinese Journal of Underground Space and Engineering
Pages 2020-2033

{{item.num}}

Comments on this article

Go to comment

< Back to all reports

Review Status: {{reviewData.commendedNum}} Commended , {{reviewData.revisionRequiredNum}} Revision Required , {{reviewData.notCommendedNum}} Not Commended Under Peer Review

Review Comment

Close
Close
Cite this article:
Xia H, Zeng X, Fu J, et al. Test Research of Ultra Deep Special-Shaped Diaphragm Wall with Rigid Joint of Row Inserted Mesh Reinforcement. Chinese Journal of Underground Space and Engineering, 2024, 20(6): 2020-2033. https://doi.org/10.20174/j.JUSE.2024.06.28

489

Views

2

Downloads

0

Crossref

0

Scopus

0

CSCD

Received: 04 March 2024
Published: 01 December 2024
© 2024 Chinese Journal of Underground Space and Engineering

This is an open access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/).