AI Chat Paper
Note: Please note that the following content is generated by AMiner AI. SciOpen does not take any responsibility related to this content.
{{lang === 'zh_CN' ? '文章概述' : 'Summary'}}
{{lang === 'en_US' ? '中' : 'Eng'}}
Chat more with AI
PDF (5.3 MB)
Collect
Submit Manuscript AI Chat Paper
Show Outline
Outline
Show full outline
Hide outline
Outline
Show full outline
Hide outline
Open Access

Study on Floating of Shield Tail Segment Controlled by Synchronous Two-Component Grout in Weathered Rock Strata

Rucheng Hu1( ), Xiaochun Zhong2, Binbin Yi2, Zhe Liu1, Cheng Liu3
China Railway No. 5 Engineering Bureau Group Co., Ltd., Changsha 410117, P. R. China
College of Civil and Transportation Engineering, Hohai University, Nanjing 210098, P. R. China
Construction Business Headquarters, Guangzhou Metro Group Co., Ltd., Guangzhou 510330, P. R. China
Show Author Information

Abstract

Aiming at the problem of excessive floating of segments when shield tunneling in full section weathered surrounding rock strata firstly, the initial setting time of the slurry was tested by the inverted cup method under different additive dosage (strengthening dry powder (Material A), liquid activator (Material B)), and the synchronous two-component grout with controllable initial setting time and satisfactory pumping performance was prepared. Secondly, the finite element model of segment floating was established, considering the nonlinearity of axial tension and circumferential shear stiffness of the ring joints. The model can be used to consider the gradual accumulation effect of floating displacement during shield tunneling, and the influence of synchronous two-component grout on the floating of shield tail segment in stable surrounding rock stratum was obtained. Finally, the developed synchronous two-component grout was applied to a shield tunnel project in Guangzhou, and the effect of controlling segment floating is verified, which greatly reduces the leakage of segment joint with excellent segment assembly quality. The results show that: (1) 1% Material A and 1.5% Material B are mixed evenly with the single grout mortar in the shield tail grouting pipe and injected into the shield tail gap, which can effectively reduce the floating displacement of the segment up to 79%. (2) The floating displacement gradually increases with the increase of the distance from the shield tail and tends to be stable. The stable position is about 10.5 m (7 rings) from the shield tail. The maximum floating displacement is about 23 mm. (3) The use of the new synchronous two-component grout also effectively reduces the number of leakage points of the segments. The reduction is up to 59%, which greatly reduces the construction cost of plugging grouting due to leakage and has good economic benefits.

CLC number: U455 Document code: A Article ID: 1673-0836(2024)06-2010-10

References

【1】
【1】
 
 
Chinese Journal of Underground Space and Engineering
Pages 2010-2019

{{item.num}}

Comments on this article

Go to comment

< Back to all reports

Review Status: {{reviewData.commendedNum}} Commended , {{reviewData.revisionRequiredNum}} Revision Required , {{reviewData.notCommendedNum}} Not Commended Under Peer Review

Review Comment

Close
Close
Cite this article:
Hu R, Zhong X, Yi B, et al. Study on Floating of Shield Tail Segment Controlled by Synchronous Two-Component Grout in Weathered Rock Strata. Chinese Journal of Underground Space and Engineering, 2024, 20(6): 2010-2019. https://doi.org/10.20174/j.JUSE.2024.06.27

544

Views

1

Downloads

0

Crossref

1

Scopus

0

CSCD

Received: 16 February 2024
Published: 01 December 2024
© 2024 Chinese Journal of Underground Space and Engineering

This is an open access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/).