AI Chat Paper
Note: Please note that the following content is generated by AMiner AI. SciOpen does not take any responsibility related to this content.
{{lang === 'zh_CN' ? '文章概述' : 'Summary'}}
{{lang === 'en_US' ? '中' : 'Eng'}}
Chat more with AI
PDF (5.9 MB)
Collect
Submit Manuscript AI Chat Paper
Show Outline
Outline
Show full outline
Hide outline
Outline
Show full outline
Hide outline
Open Access

Study on Stress Mechanism and Countermeasure of Multi-Arch Tunnel without Middle Drift

Zhihou Li1, Anmin Wang2, Shuwang Chen2, Junwu Chen2,3( ), Zhiyun Deng3
Yunnan Communications Investment & Construction Group Co., Ltd., Kunming 650032, P. R. China
Yunnan Institute of Transportation Planning and Design, Kunming 650011, P. R. China
School of Civil Engineering, Beijing Jiaotong University, Beijing 100044, P. R. China
Show Author Information

Abstract

The multi-arch tunnel without middle drift is the latest development type of the multi-arch tunnel, which can significantly improve the construction efficiency and reduce the project cost. However, there are some disadvantages such as close construction, multiple transformation of the stress system and difficult construction control. Therefore, the mechanical mechanism and failure characteristics of the lining structure of the multi-arch tunnel without middle drift are studied through model tests, combined with typical tunnel disease characteristics and the construction experiences of 65 tunnels, the safety construction countermeasures of the unguided arch tunnel are put forward. The model experiment results show that: The bending moment and axial force values of the right arch waist of the advance hole are both largest and the most unfavorable parts. Therefore, the structural design and construction quality control of the right arch waist and other parts of the advance hole need to be strengthened, and countermeasures of the thirty words principle of "pay attention to geology, strong advance, pre-reinforcement, stable middle wall, first support, short excavation, weak blasting, frequent measurement, tight secondary lining and detail injection" are proposed. The countermeasures in this paper have guiding significance for the design and safe construction of multi-arch tunnel without middle drift.

CLC number: TU984 Document code: A Article ID: 1673-0836(2024)06-1969-10

References

【1】
【1】
 
 
Chinese Journal of Underground Space and Engineering
Pages 1969-1978

{{item.num}}

Comments on this article

Go to comment

< Back to all reports

Review Status: {{reviewData.commendedNum}} Commended , {{reviewData.revisionRequiredNum}} Revision Required , {{reviewData.notCommendedNum}} Not Commended Under Peer Review

Review Comment

Close
Close
Cite this article:
Li Z, Wang A, Chen S, et al. Study on Stress Mechanism and Countermeasure of Multi-Arch Tunnel without Middle Drift. Chinese Journal of Underground Space and Engineering, 2024, 20(6): 1969-1978. https://doi.org/10.20174/j.JUSE.2024.06.23

488

Views

3

Downloads

0

Crossref

0

Scopus

0

CSCD

Received: 18 March 2024
Published: 01 December 2024
© 2024 Chinese Journal of Underground Space and Engineering

This is an open access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/).