AI Chat Paper
Note: Please note that the following content is generated by AMiner AI. SciOpen does not take any responsibility related to this content.
{{lang === 'zh_CN' ? '文章概述' : 'Summary'}}
{{lang === 'en_US' ? '中' : 'Eng'}}
Chat more with AI
PDF (2.8 MB)
Collect
Submit Manuscript AI Chat Paper
Show Outline
Outline
Show full outline
Hide outline
Outline
Show full outline
Hide outline
Open Access

Correction of Peck Settlement Formula for Large Diameter Shield Construction in Upper Soft and Lower Hard Strata

Yuan Mei1,2Wenyan Shi1,2( )Dongbo Zhou1,2Rong Wang3Wangyang Xu1,2
School of Civil Engineering, Xi'an University of Architecture and Technology, Xi'an 710055, P. R. China
Shaanxi Key Lab of Geotechnical and Underground Space Engineering, Xi'an University of Architecture and Technology, Xi'an 710055, P. R. China
School of Civil Engineering, Xi'an Traffic Engineering Institute, Xi'an 710300, P. R. China
Show Author Information

Abstract

In order to reasonably predict the surface settlement caused by the construction of large-diameter slurry shield, this paper conducts regression analysis on the actual measured data in the field and studies the adaptability of Peck's formula in the prediction of settlement of large-diameter slurry shield, while introducing the correction factor α for the maximum surface settlement and the correction factor β for the width of the settlement trough to correct Peck's formula. The results show that: There is a significant difference between the measured settlement value of large diameter slurry shield tunneling in upper soft and lower hard composite strata and the predicted settlement value of Peck formula after linear regression. When the value of α is distributed between 0.1 and 0.5 and the value of β is distributed between 0.5 and 1.0, it can better reflect the surface settlement deformation of large diameter slurry shield in the upper soft and lower hard strata. By comparing and analyzing the correction coefficients of settlement trough for small diameter and large diameter shield tunnels, it can be seen that the variation range of the correction coefficient of settlement trough increases with the increase of the excavation cross-sectional area and the difference in soil properties of the excavation surface. The research results can expand the application scope of the Peck formula and provide a reference for the design and construction of large diameter shield tunnels.

CLC number: U25 Document code: A Article ID: 1673-0836(2024)06-1798-08

References

【1】
【1】
 
 
Chinese Journal of Underground Space and Engineering
Pages 1798-1805

{{item.num}}

Comments on this article

Go to comment

< Back to all reports

Review Status: {{reviewData.commendedNum}} Commended , {{reviewData.revisionRequiredNum}} Revision Required , {{reviewData.notCommendedNum}} Not Commended Under Peer Review

Review Comment

Close
Close
Cite this article:
Mei Y, Shi W, Zhou D, et al. Correction of Peck Settlement Formula for Large Diameter Shield Construction in Upper Soft and Lower Hard Strata. Chinese Journal of Underground Space and Engineering, 2024, 20(6): 1798-1805. https://doi.org/10.20174/j.JUSE.2024.06.05

460

Views

1

Downloads

0

Crossref

2

Scopus

0

CSCD

Received: 22 April 2024
Published: 01 December 2024
© 2024 Chinese Journal of Underground Space and Engineering

This is an open access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/).