Study on Hierarchical Prevention Method of Heat Hazard in Geothermal Tunnel Construction

Qi Chen1, Yiqi Zhao2, Yunlei Zhou2, Heng Zhang2( ), Shougen Chen2
China MCC5 Group Corp. Ltd., Chengdu 610063, P. R. China
Key Laboratory of Transportation Tunnel Engineering, Ministry of Education, Southwest Jiaotong University, Chengdu 610031, P. R. China
Show Author Information

Abstract

When tunneling progresses into the geothermal areas, the high-temperature environment threatens the quality of engineering structures and the health of workers, reduces the work efficiency of staff, or impacts the normal operation of mechanical and electronic equipment. Therefore, it is significantly important to understand the heat transfer characteristics of geothermal construction tunnels for cost-effective heat-hazard-prevention measures. Based on the understanding of the thermal characteristics of geothermal construction tunnel, a method of heat-hazard prevention based on fuzzy comprehensive evaluation of heat hazards is proposed. Firstly, considering the factors of geothermal, construction conditions, subjective and objective construction workers, fuzzy comprehensive evaluations of heat hazards for different stages of tunnel excavation are carried out. Then, corresponding heat hazard prevention measures are formulated according to the heat hazard evaluation results. Finally, heat hazard evaluations and heat hazard prevention measures are constantly updated and iterative throughout construction period. While ensuring the cooling and prevention of heat hazards, the cost of heat hazard prevention measures is reduced, as well as the consumption of energy and resources, that makes the whole process of geothermal tunnel construction safe and economical.

CLC number: TU94 Document code: A Article ID: 1673-0836(2024)05-1717-13

References

【1】
【1】
 
 
Chinese Journal of Underground Space and Engineering
Pages 1717-1729

{{item.num}}

Comments on this article

Go to comment

< Back to all reports

Review Status: {{reviewData.commendedNum}} Commended , {{reviewData.revisionRequiredNum}} Revision Required , {{reviewData.notCommendedNum}} Not Commended Under Peer Review

Review Comment

Close
Close
Cite this article:
Chen Q, Zhao Y, Zhou Y, et al. Study on Hierarchical Prevention Method of Heat Hazard in Geothermal Tunnel Construction. Chinese Journal of Underground Space and Engineering, 2024, 20(5): 1717-1729. https://doi.org/10.20174/j.JUSE.2024.05.28

521

Views

1

Downloads

0

Crossref

3

Scopus

1

CSCD

Received: 29 March 2024
Published: 01 October 2024
© 2024 Chinese Journal of Underground Space and Engineering

This is an open access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/).