AI Chat Paper
Note: Please note that the following content is generated by AMiner AI. SciOpen does not take any responsibility related to this content.
{{lang === 'zh_CN' ? '文章概述' : 'Summary'}}
{{lang === 'en_US' ? '中' : 'Eng'}}
Chat more with AI
PDF (5 MB)
Collect
Submit Manuscript AI Chat Paper
Show Outline
Outline
Show full outline
Hide outline
Outline
Show full outline
Hide outline
Open Access

Research on Inadequate Lining Thickness and Dehollowing Hazards and Remediation in the Vault Area of Operational Tunnels

Cheng Ji1, Lun Gong1( ), Yongjie Fan2, Peng Zhang2
Key Laboratory of Transportation Tunnel Engineering, Ministry of Education, Southwest Jiaotong University, Chengdu 610031, P. R. China
China Railway Chengdu Bureau Group Ltd., Chengdu 610031, P. R. China
Show Author Information

Abstract

Inadequate lining thickness and debonding are very common in operating tunnel vaults, which may cause local cracking and falling blocks in the lining and threaten tunnel operation safety if not rectified in time. By means of data research, numerical calculation and field application, the hazards of such defects and their remediation measures were studied. The study shows that: the severity of insufficient lining thickness and debonding is graded by 2.0 m and 6.0 m in longitudinal and circular directions; When the lining defect range is small, the lining thickness change has less effect on the lining stress. When the lining defect range is larger than 4 m2 and the lining thickness is less than 40% of the design thickness, it will cause sudden change of lining stress; When the single size of defects in longitudinal and circular directions is larger than 2 m, the circular dimension is more likely than the longitudinal. When the longitudinal and circumferential single size of defects is larger than 2 m, the circumferential size is more likely to cause the change of lining stress than the longitudinal size; Combined with the grading of lining defects and lining thickness, three remediation schemes of filling and grouting, window repair and lining set are proposed; Based on the actual application of the project, the correctness of the grading of defects and the feasibility and effectiveness of the remediation scheme are verified, which can provide some guidance and reference for the remediation of insufficient tunnel lining thickness and dehollowing.

CLC number: U45 Document code: A Article ID: 1673-0836(2024)05-1706-11

References

【1】
【1】
 
 
Chinese Journal of Underground Space and Engineering
Pages 1706-1716

{{item.num}}

Comments on this article

Go to comment

< Back to all reports

Review Status: {{reviewData.commendedNum}} Commended , {{reviewData.revisionRequiredNum}} Revision Required , {{reviewData.notCommendedNum}} Not Commended Under Peer Review

Review Comment

Close
Close
Cite this article:
Ji C, Gong L, Fan Y, et al. Research on Inadequate Lining Thickness and Dehollowing Hazards and Remediation in the Vault Area of Operational Tunnels. Chinese Journal of Underground Space and Engineering, 2024, 20(5): 1706-1716. https://doi.org/10.20174/j.JUSE.2024.05.27

501

Views

2

Downloads

0

Crossref

0

Scopus

0

CSCD

Received: 22 December 2023
Published: 01 October 2024
© 2024 Chinese Journal of Underground Space and Engineering

This is an open access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/).