AI Chat Paper
Note: Please note that the following content is generated by AMiner AI. SciOpen does not take any responsibility related to this content.
{{lang === 'zh_CN' ? '文章概述' : 'Summary'}}
{{lang === 'en_US' ? '中' : 'Eng'}}
Chat more with AI
PDF (8.7 MB)
Collect
Submit Manuscript AI Chat Paper
Show Outline
Outline
Show full outline
Hide outline
Outline
Show full outline
Hide outline
Open Access

Optimization of Mining Methods and Analysis of Mining Effect for Hanging Wall Low-Grade Ores in Jinchuan No. 2 Mine Area

Jia Sheng1,2,3( ), Wen Wan1, Haiyun Zhang2,3, Yuding Wang2,3, Xiangdong Li2,3
School of Resource & Environment and Safety Engineering, Hunan University of Science and Technology, Xiangtan Hunan 411201, P. R. China
Changsha Institute of Mining Research Co., Ltd., Changsha 410012, P. R. China
State Key Laboratory of Safety Technology for Metal Mines, Changsha 410012, P. R. China
Show Author Information

Abstract

Jinchuan nickel mine is the largest nickel resource production base in China. With the rapid depletion of rich ore resources in Jinchuan No. 2 mine area, it is urgently necessary to mine the hanging wall low-grade ore resources to stabilize the mining area’s production capacity. The process of rich ore mining disrupts the original geo-stress field in the rock mass, causing the deformation and destruction of the hanging wall low-grade ores and surrounding rock mass, seriously affecting the overall stability of the mining of low-grade ore resources. Given the technical difficulties in mining the hanging wall low-grade ores, three technically feasible mining methods have been developed, including downward drift filling combined with subsection medium-deep hole subsequent filling mining method. In addition, the unascertained measure theory is employed to determine the optimal mining scheme. By constructing the whole numerical model of the Jinchuan No. 2 mine area and verifying its reliability, a numerical simulation analysis of the mining effect of the low-grade ore resources mining plan was carried out. It was found that the mechanized panel downward layered large drift cemented filling mining method has the smallest stress concentration and the relative minimum total displacement, which is more conducive to the overall stability of the panel. Based on the practice of mine production, the industrial field test of mechanized panel downward layered large drift cemented filling mining method is carried. Established a full-digital microseismic monitoring system and multi-parameter weight early warning model in the mining area, real-time early warning and countermeasures. The mining site has a loss rate of 7.0% and a dilution rate of 6.5%. The research results can provide technical support for efficient and safe mining of low-grade ore resources or secondary resources and have broad application prospects.

CLC number: TD8 Document code: A Article ID: 1673-0836(2024)04-1389-12

References

【1】
【1】
 
 
Chinese Journal of Underground Space and Engineering
Pages 1389-1400

{{item.num}}

Comments on this article

Go to comment

< Back to all reports

Review Status: {{reviewData.commendedNum}} Commended , {{reviewData.revisionRequiredNum}} Revision Required , {{reviewData.notCommendedNum}} Not Commended Under Peer Review

Review Comment

Close
Close
Cite this article:
Sheng J, Wan W, Zhang H, et al. Optimization of Mining Methods and Analysis of Mining Effect for Hanging Wall Low-Grade Ores in Jinchuan No. 2 Mine Area. Chinese Journal of Underground Space and Engineering, 2024, 20(4): 1389-1400. https://doi.org/10.20174/j.JUSE.2024.04.33

523

Views

7

Downloads

0

Crossref

0

Scopus

0

CSCD

Received: 24 September 2023
Published: 01 August 2024
© 2024 Chinese Journal of Underground Space and Engineering

This is an open access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/).