AI Chat Paper
Note: Please note that the following content is generated by AMiner AI. SciOpen does not take any responsibility related to this content.
{{lang === 'zh_CN' ? '文章概述' : 'Summary'}}
{{lang === 'en_US' ? '中' : 'Eng'}}
Chat more with AI
PDF (5.9 MB)
Collect
Submit Manuscript AI Chat Paper
Show Outline
Outline
Show full outline
Hide outline
Outline
Show full outline
Hide outline
Open Access

FEM Analysis of the Whole Construction Process of Super-Long Inclined Connecting Passage by Freezing Method

Yafeng Xu1,2, Jun Tong3, Wei Chen1,2, Hongyu Ma1,2, Fubin Tu3( )
China Construction First Group Construction & Development Co., Ltd., Beijing 100102, P. R. China
China State Construction Cooperation, Beijing 100029, P. R. China
Faculty of Engineering, China University of Geosciences (Wuhan), Wuhan 430074, P. R. China
Show Author Information

Abstract

The ground freezing technology is usually used to improve the strength and stability of soil when excavating the subway connecting passage in coastal soft soil areas. Frost heave, stress concentration of segments and liners, thawing settlement etc. problems are great challenges in the construction process of freezing method. Based on the freezing construction method of a super long inclined connecting passage of Tianjin Metro Line 7, this paper uses ABAQUS software to establish a 3D sequential thermo-mechanical coupled finite element model to carry out numerical analysis of the whole process including active freezing period, maintenance freezing period and natural thawing period according to the construction sequence. The results show that for inclined connecting passage, the frost heaving and thawing vertical displacements of the ground surface are unidirectionally symmetric, and the stress distributions of the tunnel segment and the inclined connecting passage liner are asymmetric. During the excavation and support process, there are large stress concentrations in the middle of the opening side of the segment and the sharp corner of the inclined connecting passage liner. After the soil thaws, the concentrated stresses at the sharp corners of the inclined connecting passage decrease due to the release of frost heave pressure, as well as those at the corners of the connecting passage straight wall.

CLC number: TU9 Document code: A Article ID: 1673-0836(2024)04-1317-10

References

【1】
【1】
 
 
Chinese Journal of Underground Space and Engineering
Pages 1317-1326

{{item.num}}

Comments on this article

Go to comment

< Back to all reports

Review Status: {{reviewData.commendedNum}} Commended , {{reviewData.revisionRequiredNum}} Revision Required , {{reviewData.notCommendedNum}} Not Commended Under Peer Review

Review Comment

Close
Close
Cite this article:
Xu Y, Tong J, Chen W, et al. FEM Analysis of the Whole Construction Process of Super-Long Inclined Connecting Passage by Freezing Method. Chinese Journal of Underground Space and Engineering, 2024, 20(4): 1317-1326. https://doi.org/10.20174/j.JUSE.2024.04.25

449

Views

3

Downloads

0

Crossref

3

Scopus

3

CSCD

Received: 26 October 2023
Published: 01 August 2024
© 2024 Chinese Journal of Underground Space and Engineering

This is an open access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/).