AI Chat Paper
Note: Please note that the following content is generated by AMiner AI. SciOpen does not take any responsibility related to this content.
{{lang === 'zh_CN' ? '文章概述' : 'Summary'}}
{{lang === 'en_US' ? '中' : 'Eng'}}
Chat more with AI
PDF (3.8 MB)
Collect
Submit Manuscript AI Chat Paper
Show Outline
Outline
Show full outline
Hide outline
Outline
Show full outline
Hide outline
Open Access

Operation and Maintenance Risk Assessment of Underground Utility Tunnels Based on FTA and Fuzzy BN

Yongjun Chen, Xiaojian Li( ), Guangye Wu, Shiyu Tian
School of Urban Economics and Management, Beijing University of Civil Engineering and Architecture, Beijing 102616, P. R. China
Show Author Information

Abstract

Accidents frequently occur in the operation and maintenance of urban underground utility tunnels. To quantify the operation and maintenance risks of utility tunnels and analyze the key risk factors, a risk assessment method for the operation and maintenance of urban underground utility tunnels based on fault tree and fuzzy Bayesian network was proposed. A fault tree was constructed based on comprehensive consideration of the risk factors of tunnel, and it was mapped to a Bayesian network. Then, the risk factor status was classified based on ALARP criteria, fuzzy number and fuzzy subset were used to calculate the probability of occurrence of bottom events, Maximum Likelihood Estimation was used to solve the conditional probability of intermediate events, and a Bayesian network model was constructed for operation and maintenance risk of utility tunnels to assess the operation and maintenance risk of urban underground utility tunnels accurately. The results show that the probability for the assessed risk level of utility tunnels’ operation and maintenance process is High is 28%, which was close to the risk threshold of 30%. Therefore, it is necessary to control the risks of the utility tunnels timely. This method can scientifically and reasonably evaluate the risk level and determine the key factors, and can be used as a decision-making tool for the safety assurance and management of the utility tunnels’ operation and maintenance.

CLC number: X913.4 Document code: A Article ID: 1673-0836(2024)03-1016-10

References

【1】
【1】
 
 
Chinese Journal of Underground Space and Engineering
Pages 1016-1025

{{item.num}}

Comments on this article

Go to comment

< Back to all reports

Review Status: {{reviewData.commendedNum}} Commended , {{reviewData.revisionRequiredNum}} Revision Required , {{reviewData.notCommendedNum}} Not Commended Under Peer Review

Review Comment

Close
Close
Cite this article:
Chen Y, Li X, Wu G, et al. Operation and Maintenance Risk Assessment of Underground Utility Tunnels Based on FTA and Fuzzy BN. Chinese Journal of Underground Space and Engineering, 2024, 20(3): 1016-1025. https://doi.org/10.20174/j.JUSE.2024.03.31

619

Views

6

Downloads

0

Crossref

0

Scopus

2

CSCD

Received: 26 September 2023
Published: 01 June 2024
© 2024 Chinese Journal of Underground Space and Engineering

This is an open access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/).