AI Chat Paper
Note: Please note that the following content is generated by AMiner AI. SciOpen does not take any responsibility related to this content.
{{lang === 'zh_CN' ? '文章概述' : 'Summary'}}
{{lang === 'en_US' ? '中' : 'Eng'}}
Chat more with AI
PDF (4.1 MB)
Collect
Submit Manuscript AI Chat Paper
Show Outline
Outline
Show full outline
Hide outline
Outline
Show full outline
Hide outline
Open Access

Monitoring Analysis on the Surrounding Deformation of Super Deep Foundation Pit during the Whole Construction Process in Urban Dense Area

Yanli Tao1,2,3( ), Kang Chen1, Jianfeng Zhu1, Xiaonan Gong4, Zeyi Yu1
School of Civil and Architectural Engineering, Zhejiang University of Science and Technology, Hangzhou 310023, P. R. China
Wuzhou Engineering Consulting Group Co, Hangzhou 310053, P. R. China
College of Civil Engineering,Nanjing University of Technology, Nanjing 211816, P. R. China
Research Center of Coastal and Urban Geotechnical Engineering, Zhejiang University, Hangzhou 310058, P. R. China
Show Author Information

Abstract

It is very important to analyze and control the environmental deformation in the whole process of super deep foundation pit construction in dense urban areas. Taking the whole construction process of a super-deep foundation pit in Hangzhou as an example, the surface settlement, lateral displacement of diaphragm wall, settlement of adjacent buildings and settlement of pipelines in the construction stage of supporting structure, excavation stage of foundation pit and demolition stage of supporting structure are measured and statistically analyzed. It is found that the maximum lateral displacement of the wall remains basically unchanged after the pouring of the foundation pit floor, which is located at 0.8 times the excavation depth, while the maximum lateral displacement continues to increase slightly during the support demolition stage, and the increase can reach 10% of the cumulative lateral displacement. Ground settlement, adjacent building settlement and pipeline settlement still show a continuous development trend after the completion of foundation pit construction. For the wall lateral displacement, surface settlement, settlement of adjacent buildings and pipeline settlement, the proportion of each construction stage is generally in the order of foundation pit excavation stage > support demolition stage > enclosure construction stage. Wall lateral displacement and surface settlement are mainly generated in the foundation pit excavation stage. The proportion of foundation pit excavation stage reaches more than 60%, up to 91.95%; the deformation of adjacent buildings and the settlement of pipelines are mainly generated in the stage of foundation pit excavation and enclosure construction. The proportion of foundation pit excavation stage is mostly about 60%, and the proportion of support demolition stage can also reach more than 30%.

CLC number: TU47 Document code: A Article ID: 1673-0836(2024)03-0969-09

References

【1】
【1】
 
 
Chinese Journal of Underground Space and Engineering
Pages 969-977

{{item.num}}

Comments on this article

Go to comment

< Back to all reports

Review Status: {{reviewData.commendedNum}} Commended , {{reviewData.revisionRequiredNum}} Revision Required , {{reviewData.notCommendedNum}} Not Commended Under Peer Review

Review Comment

Close
Close
Cite this article:
Tao Y, Chen K, Zhu J, et al. Monitoring Analysis on the Surrounding Deformation of Super Deep Foundation Pit during the Whole Construction Process in Urban Dense Area. Chinese Journal of Underground Space and Engineering, 2024, 20(3): 969-977. https://doi.org/10.20174/j.JUSE.2024.03.26

735

Views

3

Downloads

0

Crossref

4

Scopus

1

CSCD

Received: 20 August 2023
Published: 01 June 2024
© 2024 Chinese Journal of Underground Space and Engineering

This is an open access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/).