The Safety Control Technology of the Blasting Construction of the Tunnel in Close Distance with the Historic Site

Yanyu Wang1, Xiaobao Wen2, Jun Wang1, Fei Ye2( ), Kai Cao2,3
China Railway 16th Bureau Group Co. , Ltd. , Beijing 100018, P. R. China
School of Highway, Chang'an University, Xi'an 710064, P. R. China
Huzhou Nanxun District Traffic Investment Group Co. , Ltd. , Huzhou Zhejiang, 313009, P. R. China
Show Author Information

Abstract

In order to reduce the safety threat of tunnel blasting construction to sensitive buildings such as adjacent monuments, based on the new Shibangou No.1 highway tunnel project, through on-site monitoring and numerical simulation, the vibration reduction law of different cutting hole types and propagation medium parameters on adjacent monuments is revealed. By monitoring the whole section blasting construction stage of the upper bench, it is found that the main factor affecting the peak vibration velocity of the control point is the cutting hole blasting, and the horizontal vibration velocity VR in the temple is significantly larger. VR reaches 0.961 cm/s at the blasting section about 60 m away from the temple, which is about to exceed the safety limit of 1.0 cm/s. It is suggested to adjust the blasting scheme with 60 m as the dividing line. In order to take into account the construction efficiency and blasting vibration reduction, the numerical simulation is used to study the construction parameters of the cutting type and the step method. The analysis shows that the influence of the cutting type and the inverted arch excavation on the control point is sectional. The inclined hole cutting type, the timely excavation of the inverted arch, the increase of the step length and the step height can reduce the peak vibration velocity of the control point by 0.071 cm/s, 0.039 cm/s, 0.097 cm/s and 0.065 cm/s, respectively. In order to ensure the smooth progress of the project, the three-section small pilot tunnel first blasting construction scheme and related auxiliary shock absorption measures are finally proposed, which effectively controls the vibration impact of tunnel blasting on ancient sites.

CLC number: U455.6 Document code: A Article ID: 1673-0836(2024)02-0645-12

References

【1】
【1】
 
 
Chinese Journal of Underground Space and Engineering
Pages 645-656

{{item.num}}

Comments on this article

Go to comment

< Back to all reports

Review Status: {{reviewData.commendedNum}} Commended , {{reviewData.revisionRequiredNum}} Revision Required , {{reviewData.notCommendedNum}} Not Commended Under Peer Review

Review Comment

Close
Close
Cite this article:
Wang Y, Wen X, Wang J, et al. The Safety Control Technology of the Blasting Construction of the Tunnel in Close Distance with the Historic Site. Chinese Journal of Underground Space and Engineering, 2024, 20(2): 645-656. https://doi.org/10.20174/j.JUSE.2024.02.31

643

Views

0

Downloads

0

Crossref

3

Scopus

2

CSCD

Received: 13 September 2023
Published: 01 April 2024
© 2024 Chinese Journal of Underground Space and Engineering

This is an open access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/).