AI Chat Paper
Note: Please note that the following content is generated by AMiner AI. SciOpen does not take any responsibility related to this content.
{{lang === 'zh_CN' ? '文章概述' : 'Summary'}}
{{lang === 'en_US' ? '中' : 'Eng'}}
Chat more with AI
PDF (3 MB)
Collect
Submit Manuscript AI Chat Paper
Show Outline
Outline
Show full outline
Hide outline
Outline
Show full outline
Hide outline
Regular Paper | Open Access

Two-stage Stochastic Scheduling of Virtual Power Plant based on Transactive Control

Meng Song1, Xiaoyuan Xu2( ), Ciwei Gao1, Zheng Yan2, Mohammad Shahidehpour3
School of Electrical Engineering, Southeast University, Nanjing 210096, China
Key Laboratory of Control of Power Transmission and Conversion (Shanghai Jiao Tong University), Ministry of Education, and also with the Shanghai Non-carbon Energy Conversion and Utilization Institute, Shanghai 200240, China
Electrical and Computer Engineering Department, Illinois Institute of Technology, Chicago, USA
Show Author Information

Abstract

Thermostatically controlled loads (TCLs) have huge thermal inertia and are promising resources to promote consumption of renewable energy sources (RESs) for carbon reduction. Thus, this paper employs the virtual power plant (VPP) to regulate TCLs to address problems caused by RESs. Specifically, a two-stage VPP scheduling framework based on multi-time scale coordinated control of TCLs is proposed to address forecast errors of variable RES power output. In the first stage (hour time scale), TCLs are controlled as virtual generators to mitigate forecast errors between hour-ahead and day-ahead RES power. In the second stage (minute time scale), TCLs are regulated as virtual batteries to mitigate forecast errors between intra-hour and hour-ahead RES power. To respect wills and preferences of end-users, a transactive energy (TE) market within VPP is built to guide TCL behaviors via the price mechanism. Moreover, a stochastic VPP schedule using the Wasserstein-metric-based distributionally robust optimization method is developed to consider RES power uncertainties, and its solution process is transformed into a computationally tractable mixed-integer linear programming problem based on the affine decision rule and duality theory. The proposed method is effectively validated by comparison with robust optimization and stochastic optimization. Simulation results demonstrate the proposed two-stage VPP scheduling method employs TCL flexibilities more comprehensively to mitigate RES output power forecast errors in VPP operations.

References

【1】
【1】
 
 
CSEE Journal of Power and Energy Systems
Pages 1442-1453

{{item.num}}

Comments on this article

Go to comment

< Back to all reports

Review Status: {{reviewData.commendedNum}} Commended , {{reviewData.revisionRequiredNum}} Revision Required , {{reviewData.notCommendedNum}} Not Commended Under Peer Review

Review Comment

Close
Close
Cite this article:
Song M, Xu X, Gao C, et al. Two-stage Stochastic Scheduling of Virtual Power Plant based on Transactive Control. CSEE Journal of Power and Energy Systems, 2025, 11(4): 1442-1453. https://doi.org/10.17775/CSEEJPES.2022.05300

838

Views

55

Downloads

8

Crossref

13

Web of Science

12

Scopus

0

CSCD

Received: 03 August 2022
Revised: 05 September 2022
Accepted: 30 August 2022
Published: 27 June 2023
© 2022 CSEE.

This is an open access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/).