AI Chat Paper
Note: Please note that the following content is generated by AMiner AI. SciOpen does not take any responsibility related to this content.
{{lang === 'zh_CN' ? '文章概述' : 'Summary'}}
{{lang === 'en_US' ? '中' : 'Eng'}}
Chat more with AI
PDF (6.4 MB)
Collect
Submit Manuscript AI Chat Paper
Show Outline
Outline
Show full outline
Hide outline
Outline
Show full outline
Hide outline
Publishing Language: Chinese

Development and application of a fully coupled wellbore-perforation-fracture temporary plugging fracturing experimental device

Tiankui GUO1,2( ), Tong HAO1,2, Yuelong ZHANG3, Ming CHEN1,2, Zhanqing QU1,2, Wenyu WANG1,2, Mingkun LYU1,2, Renjie YANG1,2, Haijing DAI4
State Key Laboratory of Deep Oil and Gas, China University of Petroleum (East China), Qingdao 266580, China
College of Petroleum Engineering, China University of Petroleum (East China), Qingdao 266580, China
PetroChina Changqing Oilfield Company, Xi'an 710018, China
Jiangsu Huaan Scientific Research Devices Co., Ltd., Haian 226600, China
Show Author Information

Abstract

[Objective]

The “inter-fracture-intra-fracture” plugging diversion fracturing technique is an effective approach for regulating fracture propagation and increasing fracture complexity in unconventional reservoirs. To support research and teaching in this area, we have developed a comprehensive physical simulation experimental system that integrates wellbore, perforation, and fracture processes. The primary goal of this system is to enable detailed physical simulations under a range of conditions, thereby advancing both the theoretical understanding and practical application of plugging diversion fracturing. This technology aims to effectively control fracture propagation and enhance fracture complexity, which is crucial for improving reservoir stimulation efficiency. To address the educational and research demands related to temporary plugging fracturing, we have created a fully integrated physical simulation system that couples wellbore, perforation, and fracture models to replicate the entire temporary plugging fracturing process across various scenarios.

[Methods]

The experimental system is designed to accommodate two primary fracturing processes: segmental plugging and intra-fracture plugging. The system facilitates experiments under varying conditions, including different pumping pressures, flow rates, perforation parameters, fracture roughness, and fracture widths. It employs flow rate monitoring at both the inlet and outlet, multipoint pressure measurements, and image processing techniques to provide a comprehensive characterization of the experimental outcomes. The system design emphasizes compactness, user-friendly operation, and safety, making it well-suited for use in both academic research and industrial applications.

[Results]

The experimental setup has proven capable of simulating the entire process of plugging diversion fracturing, from surface operations to subsurface responses. Through precise measurements and visual observations, the system captures the movement and blocking behavior of plugging materials within the wellbore, perforations, and fractures. This provides a robust platform for researchers to optimize plugging diversion fracturing strategies, evaluate the performance of plugging materials, and refine operational parameters. Additionally, the system’s visualization capabilities serve as an educational tool, allowing students to gain a deeper understanding of the underlying mechanisms through hands-on experience.

[Conclusions]

The self-developed, fully coupled wellbore–perforation–fracture temporary plugging fracturing experimental device is expected to address key engineering challenges, including the design of temporary plugging fracturing schemes, optimization of operational parameters, and the selection and evaluation of plugging materials. This device provides robust scientific support and technical assistance for the efficient development of oil and gas fields and plays an indispensable role in higher education, particularly in the teaching and research activities of petroleum engineering and related disciplines. By simulating the entire process: from surface operations to subsurface responses, this device fills a significant gap in the industry’s physical simulation equipment for temporary plugging fracturing. It offers an intuitive and interactive learning platform that enhances the content of oil reservoir engineering courses and effectively bridges the gap between theoretical knowledge and complex engineering practices. Through hands-on experimental teaching, students can gain a deeper understanding of the mechanisms behind temporary plugging fracturing and observe the entire process of plugging material transport and sealing in a safe, controlled environment. This practical experience is crucial for reinforcing professional knowledge and developing the skills necessary to tackle complex engineering challenges. Furthermore, the device serves as a catalyst for graduate research and technological innovation, inspiring students to explore new technologies and materials, thereby contributing to a sustainable future for oil and gas resource development. Its broader impact lies in facilitating industry–academia collaboration, bridging the gap between knowledge exchange and technology transfer between universities and the industry, and fostering a mutually beneficial relationship between education and industrial development.

CLC number: TE357.1 Document code: A Article ID: 1002-4956(2025)01-0161-08

References

【1】
【1】
 
 
Experimental Technology and Management
Pages 161-168

{{item.num}}

Comments on this article

Go to comment

< Back to all reports

Review Status: {{reviewData.commendedNum}} Commended , {{reviewData.revisionRequiredNum}} Revision Required , {{reviewData.notCommendedNum}} Not Commended Under Peer Review

Review Comment

Close
Close
Cite this article:
GUO T, HAO T, ZHANG Y, et al. Development and application of a fully coupled wellbore-perforation-fracture temporary plugging fracturing experimental device. Experimental Technology and Management, 2025, 42(1): 161-168. https://doi.org/10.16791/j.cnki.sjg.2025.01.020

705

Views

3

Downloads

0

Crossref

2

Scopus

Received: 02 August 2024
Revised: 12 September 2024
Published: 20 January 2025
© 2025 Experimental Technology and Management. All rights reserved.