Publishing Language: Chinese | Open Access

A Three-Layer Collaborative Optimization Strategy for Virtual Power Plant Based on Multi-Agent Hybrid Game

Xu HAN1, Xiaotong SONG2( ), Kunyu YU1, Yiming LAI1, Wenyue XU3
School of Electrical and Control Engineering, North China University of Technology, Shijingshan District, Beijing 100144, China
School of Energy Storage Science and Engineering, North China University of Technology, Shijingshan District, Beijing 100144, China
Fangshan Power Supply Company, State Grid Beijing Electric Power Company, Fangshan District, Beijing 102401, China
Show Author Information

Abstract

To address the challenges of diversified participants in the electricity market and resolve conflicts of interest among multiple virtual power plants (VPPs), this paper proposes a three-layer hybrid game strategy involving the distribution system operator (DSO), virtual power plant operator (VPPO), and user aggregator (UA) to support collaborative optimization of multi-VPP systems. First, a UA coalition is formed by aggregating various flexible resources, including photovoltaic prosumers, electric vehicle charging stations, and integrated energy loads. Next, a three-layer hybrid game model is constructed, encompassing hierarchical energy transactions among DSO, VPPO, and UA, as well as peer-to-peer energy trading among UA entities, structured as a "Stackelberg game - Stackelberg game - cooperative game" framework. Finally, the proposed model is solved using the bisection method, Karush-Kuhn-Tucker conditions, and the alternating direction multiplier method. Case studies demonstrate that the proposed multi-layer hybrid game strategy reduces the operating costs of the photovoltaic prosumer UA and the electric vehicle charging station UA by 4.5% and 15.3%, respectively. Meanwhile, guided by the dynamic pricing mechanism of the DSO, the total profit of the system operators increases by 2.7%. This strategy can effectively balance the interests of multiple stakeholders, optimizing the energy trading and benefit allocation mechanisms among different operators.

CLC number: TK 01 Document code: A

References

【1】
【1】
 
 
Distributed Energy
Pages 29-42

{{item.num}}

Comments on this article

Go to comment

< Back to all reports

Review Status: {{reviewData.commendedNum}} Commended , {{reviewData.revisionRequiredNum}} Revision Required , {{reviewData.notCommendedNum}} Not Commended Under Peer Review

Review Comment

Close
Close
Cite this article:
HAN X, SONG X, YU K, et al. A Three-Layer Collaborative Optimization Strategy for Virtual Power Plant Based on Multi-Agent Hybrid Game. Distributed Energy, 2026, 11(4): 29-42. https://doi.org/10.16513/j.2096-2185.DE.26110085

2

Views

0

Downloads

0

Crossref

Received: 26 February 2026
Revised: 27 March 2026
Published: 25 August 2026
© Editorial Department of Distributed Energy Journal 2026. Published by Tsinghua University Press.

This is an open access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/).