Publishing Language: Chinese | Open Access

Optimization Model of Virtual Power Plant Participating in Power Peak Shaving Decision Based on Resource Response Capability and IGDT

Meng YU1,2( ), Yan LI1,2, Liangliang ZHU1,2, Xiangyu GUO3, Min ZHANG3, Chenguan XU1,2
State Grid Electric Power Research Institute Wuhan Efficiency Evaluation Co., Ltd., Wuhan 430074, Hubei Province, China
State Grid Electric Power Research Institute, Nanjing 210000, Jiangsu Province, China
State Grid Shanxi Electric Power Research Institute, Taiyuan 030001, Shanxi Province, China
Show Author Information

Abstract

To address the optimization problem of resource aggregation and bidding decision-making for virtual power plant (VPP) participating in power peak shaving, a decision optimization model based on resource response capability and information gap decision theory (IGDT) is proposed. Considering four dimensions: response potential, fluctuation degree, duration, and response speed, an aggregation indicator system for distributed resources is constructed. A multi-objective aggregation optimization model is established, balancing the maximization of expected response revenue and the minimization of deviation penalty risk, to screen the optimal resource portfolio. The market transaction framework and bidding decision mechanism for VPP participating in power peak shaving are designed. The IGDT theory is introduced to characterize the uncertainty of peak shaving compensation prices, and a risk-averse (RA) model is constructed to optimize bidding strategies. The simulation results show that the multi-objective optimization model of VPP aggregation can take into account both economic and risk considerations. It can provide a theoretical method for VPP aggregators to screen resources and reduce the risk of deviation punishment of VPP. The IGDT-based bidding decision optimization model can help avoid the transaction risk caused by the uncertainty of peak compensation price, so that the VPP can obtain reasonable response benefits.

CLC number: TK 01 Document code: A

References

【1】
【1】
 
 
Distributed Energy
Pages 43-57

{{item.num}}

Comments on this article

Go to comment

< Back to all reports

Review Status: {{reviewData.commendedNum}} Commended , {{reviewData.revisionRequiredNum}} Revision Required , {{reviewData.notCommendedNum}} Not Commended Under Peer Review

Review Comment

Close
Close
Cite this article:
YU M, LI Y, ZHU L, et al. Optimization Model of Virtual Power Plant Participating in Power Peak Shaving Decision Based on Resource Response Capability and IGDT. Distributed Energy, 2026, 11(4): 43-57. https://doi.org/10.16513/j.2096-2185.DE.25100203

2

Views

0

Downloads

0

Crossref

Received: 28 December 2025
Revised: 12 February 2026
Published: 25 August 2026
© Editorial Department of Distributed Energy Journal 2026. Published by Tsinghua University Press.