AI Chat Paper
Note: Please note that the following content is generated by AMiner AI. SciOpen does not take any responsibility related to this content.
{{lang === 'zh_CN' ? '文章概述' : 'Summary'}}
{{lang === 'en_US' ? '中' : 'Eng'}}
Chat more with AI
PDF (14.2 MB)
Collect
Submit Manuscript AI Chat Paper
Show Outline
Outline
Show full outline
Hide outline
Outline
Show full outline
Hide outline
Publishing Language: Chinese

Optimizing the deployment of charging systems on an expressway network considering the construction time sequence and the dynamic charging demand

Yang YANG1( ), Tianyu ZHANG1, Yuting ZHU2, Enjian YAO1
Key Laboratory of Transport Industry of Big Data Application Technologies for Comprehensive Transport, Beijing Jiaotong University, Beijing 100044, China
School of E-business and Logistics, Beijing Technology and Business University, Beijing 100048, China
Show Author Information

Abstract

A bi-level optimization model was developed for planning charging facility deployment on an intercity highway network. The model balances the variable charging demand and the construction time sequence. The lower model is based on a dynamic traffic assignment model. The spatial-temporal distribution of the charging demand at equilibrium was obtained from simulations of multi-user driving and charging behavior. The upper model optimizes the charging station's locations and capacities using construction time sequence and level of service (LOS) constraints to minimize the operator investment. The model is then used to analyze the intercity highway network between Jinan and Qingdao in the Shandong Peninsula urban agglomeration. The model provides reliable estimates of the real-time charging system LOS and a satisfactory layout based on the user chargig preferences, network traffic conditions, and facility conditions. The layout was then analysed using forward and reverse construction time sequences. The results show that for the same LOS constraint, long-term deployment should consider future energy demands and the planners should use the reverse construction time sequence method.

CLC number: U491.1+2 Document code: A Article ID: 1000-0054(2022)07-1163-15

References

【1】
【1】
 
 
Journal of Tsinghua University (Science and Technology)
Pages 1163-1177

{{item.num}}

Comments on this article

Go to comment

< Back to all reports

Review Status: {{reviewData.commendedNum}} Commended , {{reviewData.revisionRequiredNum}} Revision Required , {{reviewData.notCommendedNum}} Not Commended Under Peer Review

Review Comment

Close
Close
Cite this article:
YANG Y, ZHANG T, ZHU Y, et al. Optimizing the deployment of charging systems on an expressway network considering the construction time sequence and the dynamic charging demand. Journal of Tsinghua University (Science and Technology), 2022, 62(7): 1163-1177. https://doi.org/10.16511/j.cnki.qhdxxb.2022.26.017

847

Views

8

Downloads

0

Crossref

13

Scopus

7

CSCD

Received: 29 October 2021
Published: 15 July 2022
© Journal of Tsinghua University (Science and Technology). All rights reserved.