Hybrid flow-shop scheduling problem considering joint of machine and AGV with renewable energy

Guangyu ZHU1,2( ), Weihong JIA1, Debiao LI3
School of Advanced Manufacturing,Fuzhou University,Quanzhou 362200,China
School of Mechanical Engineering and Automation,Fuzhou University,Fuzhou 350108,China
School of Economics and Management,Fuzhou University,Fuzhou 350108,China
Show Author Information

Abstract

The manufacturing industry in China is undergoing a digital and green low-carbon transformation. To achieve energy saving and emission reduction and improve the equipment utilization rate, a mathematical model of the hybrid flow-shop scheduling problem considering the joint of machine and automated guided vehicle (AGV) with renewable energy (HFSP-MA-RE) was established.To resolve this model, a joint scheduling strategy and an energy distribution strategy of machines and AGVs based on advance scheduling were proposed. In the case of AGV path optimization and charging constraints, four objectives of the maximum completion time, carbon emissions, total energy consumption, and AGV utilization rate were optimized.The multi-objective optimal foraging algorithm based on a positive projection gray target (PPGT_OFA) was constructed to resolve this problem. Through twenty-four test cases and one engineering application, the proposed algorithm and five multi-objective optimization algorithms were tested to verify the effectiveness of the HFSP-MA-RE model and PPGT_OFA in solving this multi-objective optimization problem.

CLC number: V221+.3;TB553 Document code: A Article ID: 1001-5965(2025)02-0368-12

References

【1】
【1】
 
 
Journal of Beijing University of Aeronautics and Astronautics
Pages 368-379

{{item.num}}

Comments on this article

Go to comment

< Back to all reports

Review Status: {{reviewData.commendedNum}} Commended , {{reviewData.revisionRequiredNum}} Revision Required , {{reviewData.notCommendedNum}} Not Commended Under Peer Review

Review Comment

Close
Close
Cite this article:
ZHU G, JIA W, LI D. Hybrid flow-shop scheduling problem considering joint of machine and AGV with renewable energy. Journal of Beijing University of Aeronautics and Astronautics, 2025, 51(2): 368-379. https://doi.org/10.13700/j.bh.1001-5965.2023.0021

977

Views

9

Downloads

0

Crossref

6

Scopus

2

CSCD

Received: 13 January 2023
Published: 11 April 2023
© Journal of Beijing University of Aeronautics and Astronautics