Quantity-price bidding optimization strategy considering risk cost of virtual power plant in the day-ahead electricity market

Wei JIA1, Zhengfeng WANG1, Zhuo GAO2, Peng FU3, Lili HAO2, Yang LEI4
State Grid Anhui Electric Power Co., Ltd., Hefei 230022, China
College of Electrical Engineering and Control Science, Nanjing Tech University, Nanjing 211816, China
State Grid Anhui Electric Power Co., Ltd. Xuancheng Power Supply Company, Xuancheng 242099, China
School of Electrical Engineering and Automation, Anhui University, Hefei 230039, China
Show Author Information

Abstract

Considering that virtual power plant (VPP) participates in the market as a price maker, and the distributed wind and solar power, as the main component of VPP, have strong randomness and volatility, and that load forecasting error will also bring certain risk costs to VPP, an optimization strategy for the bidding of VPP participating in the day-ahead electricity market considering the risk cost is established. Firstly, the uncertainty inside VPP is processed to obtain the expected scenario of the prediction error, and the risk cost caused by the prediction error is modeled to quantify the risk. Then, based on the guidance mechanism of VPP to internal resources, the quantity-price method of VPP in the day-ahead electricity market is designed, and the optimization model of VPP in the day-ahead electricity market is established. Monte Carlo and K-means clustering are used to deal with prediction errors. The particle swarm optimization algorithm is used to solve the model. Finally, a case study demonstrates that the proposed method can effectively manage the internal resources of VPP and avoid risks to improve the income.

CLC number: TM73 Document code: A

References

【1】
【1】
 
 
Electric Power Engineering Technology
Pages 137-147

{{item.num}}

Comments on this article

Go to comment

< Back to all reports

Review Status: {{reviewData.commendedNum}} Commended , {{reviewData.revisionRequiredNum}} Revision Required , {{reviewData.notCommendedNum}} Not Commended Under Peer Review

Review Comment

Close
Close
Cite this article:
JIA W, WANG Z, GAO Z, et al. Quantity-price bidding optimization strategy considering risk cost of virtual power plant in the day-ahead electricity market. Electric Power Engineering Technology, 2026, 45(10): 137-147. https://doi.org/10.12158/j.2096-3203.2026.10.014

7

Views

0

Downloads

0

Crossref

0

Scopus

Received: 18 March 2026
Revised: 12 May 2026
Published: 30 October 2026
© After publication of the article, the authors shall own the right of signature. 2026.

The authors can use or share the published article under the Attribution-Non Commercial 4.0 International (CC BY-NC 4.0) license.