AI Chat Paper
Note: Please note that the following content is generated by AMiner AI. SciOpen does not take any responsibility related to this content.
{{lang === 'zh_CN' ? '文章概述' : 'Summary'}}
{{lang === 'en_US' ? '中' : 'Eng'}}
Chat more with AI
PDF (1.1 MB)
Collect
Submit Manuscript AI Chat Paper
Show Outline
Outline
Show full outline
Hide outline
Outline
Show full outline
Hide outline
Publishing Language: Chinese | Open Access

Two-stage robust optimization configuration of comprehensive energy system for the new energy town

Li HUJing CHENG
Engineering Research Center for Renewable Energy Power Generation and Grid-Connected Control, Ministry of Education, Xinjiang University, Urumqi 830047, China
Show Author Information

Abstract

A two-stage robust optimization configuration strategy for the new energy town is proposed to address the issue of insufficient power supply reliability in integrated energy systems due to the fluctuation and intermittency characteristics during the integration of a high proportion of renewable energy. In the first stage, historical source-load data is utilized to make preliminary decisions on unit capacity configuration, with the objective of minimizing system configuration costs. In the second stage, polyhedral uncertainty sets are employed to describe the uncertainties of source-load, aiming to minimize system operation costs, and power data predictions for the worst-case scenarios are obtained based on the decision outcomes of the first stage. An uncertainty parameter is then introduced to control the conservativeness of the robust optimization configuration scheme. The model is solved using the column and constraint generation (C&CG) algorithm, which iteratively determines unit capacity configuration and converges to the optimal configuration scheme. A case study of the new energy town in Northern China is conducted, and the results verify the effectiveness and feasibility of the proposed strategy and optimization method, demonstrating their capability to enhance the power supply reliability and economy of the new energy town.

CLC number: TM721 Document code: A

References

【1】
【1】
 
 
Electric Power Engineering Technology
Pages 21-29

{{item.num}}

Comments on this article

Go to comment

< Back to all reports

Review Status: {{reviewData.commendedNum}} Commended , {{reviewData.revisionRequiredNum}} Revision Required , {{reviewData.notCommendedNum}} Not Commended Under Peer Review

Review Comment

Close
Close
Cite this article:
HU L, CHENG J. Two-stage robust optimization configuration of comprehensive energy system for the new energy town. Electric Power Engineering Technology, 2026, 45(2): 21-29. https://doi.org/10.12158/j.2096-3203.2026.02.003

5

Views

0

Downloads

0

Crossref

0

Scopus

Received: 10 June 2025
Revised: 28 October 2025
Published: 28 February 2026
© After publication of the article, the authors shall own the right of signature. 2026.

The authors can use or share the published article under the Attribution-Non Commercial 4.0 International (CC BY-NC 4.0) license.