AI Chat Paper
Note: Please note that the following content is generated by AMiner AI. SciOpen does not take any responsibility related to this content.
{{lang === 'zh_CN' ? '文章概述' : 'Summary'}}
{{lang === 'en_US' ? '中' : 'Eng'}}
Chat more with AI
PDF (737.8 KB)
Collect
Submit Manuscript AI Chat Paper
Show Outline
Outline
Show full outline
Hide outline
Outline
Show full outline
Hide outline
Publishing Language: Chinese | Open Access

Joint Planning Technology of Source-Network-Load-Storage in Distribution Network Considering Reliability

Weicong CaiXiangang Peng( )Zhuozhuo ChuWenwei YangZhuoli Zhao
School of Automation, Guangdong University of Technology, Guangzhou 510006, China
Show Author Information

Abstract

The large-scale integration of distributed photovoltaics poses challenges to the economy and reliability of the distribution network. To address this, a coordinated planning approach of "source-grid-load-storage" considering reliability has been proposed. Firstly, a bi-level coordination planning model of "source-network-charge-storage" with reliability is established. The upper-level is established to minimize the cost and maximize the revenue of reliability, and the lower-level is established to minimize the cost of operation and voltage quality. The weighted coefficient method is used to transform the multi-objective into a single-objective in the upper and lower level. And the model considers constraints such as power balance, power flow, and configuration capacity of system. Next, Crisscross optimization algorithm is used to solve the model with gurobi solver jointly. Finally, IEEE 33-node system is utilized to verify the effectiveness and practicality of the proposed method. The results show that the joint planning model of "source-network-load-storage" which considers the reliability can minimize the cost while improve the reliability and voltage quality.

CLC number: TM715

References

【1】
【1】
 
 
Journal of Guangdong University of Technology
Pages 68-76

{{item.num}}

Comments on this article

Go to comment

< Back to all reports

Review Status: {{reviewData.commendedNum}} Commended , {{reviewData.revisionRequiredNum}} Revision Required , {{reviewData.notCommendedNum}} Not Commended Under Peer Review

Review Comment

Close
Close
Cite this article:
Cai W, Peng X, Chu Z, et al. Joint Planning Technology of Source-Network-Load-Storage in Distribution Network Considering Reliability. Journal of Guangdong University of Technology, 2025, 42(5): 68-76. https://doi.org/10.12052/gdutxb.240125

562

Views

1

Downloads

0

Crossref

Received: 30 October 2024
Accepted: 11 February 2025
Published: 03 June 2025
© 2025 Editorial Office of Journal of Guangdong University of Technology

This is an open access article under the CC BY-NC-ND license (https://creativecommons.org/licenses/by-nc-nd/4.0/).