Field test study on vibration reduction effect of blasting barrier hole during excavation of foundation pit

Anlin LV1, Kai ZHANG1, Zhenyu WU2, Jianxin WANG3, Baitong FAN2, Qi PENG3, Dehua CHAI2, Banghao WANG4, Jianbo ZHU1( )
Guangdong Provincial Key Laboratory of Deep Earth Sciences and Geothermal Energy Exploitation and Utilization; Institute of Deep Earth Sciences and Green Energy; College of Civil and Transportation Engineering, Shenzhen University, Shenzhen 518060, Guangdong, P. R. China
China Railway 25th Bureau Group Co., Ltd. Shield Engineering Branch, Guangzhou 510600, P. R. China
Shenzhen Municipal Design and Research Institute, Shenzhen 518029, Guangdong, P. R. China
Changchun Guoxi Real Estate Co. Ltd, Changchun 130022, P. R. China
Show Author Information

Abstract

In order to reduce the dynamic disturbance of adjacent structures caused by blasting construction of foundation pit by using blasting, field test to study the vibration reduction law of the blasting barrier holes was conducted relying on the blasting construction project of foundation pit of No. 1 comprehensive well of Shenzhen Metro Line 16. Based on monitoring of the ground vibration under different blasting barrier hole parameters, influence of blasting barrier hole on peak velocity and dominant frequency of particle vibration on the ground and the influence of parameters of blasting barrier hole on its vibration barrier effect were analyzed. It is found that when the diameter of the blasting barrier hole increases, the vibration isolation rate of vibration barrier hole (VIR) in horizontal radial and horizontal tangential directions increase first and then decrease, the VIR in vertical direction increases and the VIR based on resultant velocity increases. Furthermore the VIR decreases first and then tends to be stable with increase of the row spacing of the damping vibration barrier holes. In addition, when the proportion of water filling in the blasting barrier hole increases, the VIR in horizontal radial direction decreases, the VIR in horizontal tangential and vertical directions increase first and then decrease, and the VIR based on resultant velocity increases first and then decreases.

CLC number: TU751.9 Document code: A Article ID: 2096-6717(2025)02-0116-10

References

【1】
【1】
 
 
Journal of Civil and Environmental Engineering
Pages 116-125

{{item.num}}

Comments on this article

Go to comment

< Back to all reports

Review Status: {{reviewData.commendedNum}} Commended , {{reviewData.revisionRequiredNum}} Revision Required , {{reviewData.notCommendedNum}} Not Commended Under Peer Review

Review Comment

Close
Close
Cite this article:
LV A, ZHANG K, WU Z, et al. Field test study on vibration reduction effect of blasting barrier hole during excavation of foundation pit. Journal of Civil and Environmental Engineering, 2025, 47(2): 116-125. https://doi.org/10.11835/j.issn.2096-6717.2023.014

842

Views

6

Downloads

0

Crossref

0

Scopus

0

CSCD

Received: 19 September 2022
Published: 01 April 2025
© Journal of Civil and Environmental Engineering