Beishan Cave 168 roof reinforcement project and construction process tracking monitoring analysis

Keyuan LIU1a,1bSiwei JIANG2Taibin FENG2Huili CHEN2Jiasong WEN3Zhigang TAO1a,1b( )
State Key Laboratory for Geomechanics & Deep Underground Engineering, China University of Mining & Technology (Beijing), Beijing 100083, P. R. China
School of Mechanics & Civil Engineering, China University of Mining & Technology (Beijing), Beijing 100083, P. R. China
Academy of Dazu Rock Carvings, Chongqing 402360, P. R. China
Bejing Guo Dian Water Resources & Electric Power Engineering Co., Ltd., Beijing100024, P. R. China
Show Author Information

Abstract

After more than 1000 years of unloading effects, the roof of Beishan Cave 168 at Dazu Rock Carvings is riddled with intersecting cracks, posing significant structural stability problems. At present, the cave roof is temporarily supported by materials like steel plates and pipes, but cracks continue to spread, and the steel plates are severely corroded, leaving the cave at risk of instability and collapse. Emergency reinforcement and protection are urgently needed. Due to the cultural importance of the site, the reinforcement process must minimize disturbance, necessitating continuous monitoring throughout construction. This paper uses numerical simulation to analyze the deformation mechanism under existing support conditions, guiding the placement of monitoring points. Monitoring data from the entire construction process are analyzed to evaluate the engineering treatment. The results provide valuable insights for monitoring and protecting similar structured grotto roofs.

CLC number: TU87 Document code: A Article ID: 1000-582X(2024)10-061-25

References

【1】
【1】
 
 
Journal of Chongqing University
Pages 61-85

{{item.num}}

Comments on this article

Go to comment

< Back to all reports

Review Status: {{reviewData.commendedNum}} Commended , {{reviewData.revisionRequiredNum}} Revision Required , {{reviewData.notCommendedNum}} Not Commended Under Peer Review

Review Comment

Close
Close
Cite this article:
LIU K, JIANG S, FENG T, et al. Beishan Cave 168 roof reinforcement project and construction process tracking monitoring analysis. Journal of Chongqing University, 2024, 47(10): 61-85. https://doi.org/10.11835/j.issn.1000.582X.2024.10.005

460

Views

1

Downloads

0

Crossref

0

Scopus

Received: 22 December 2023
Published: 01 October 2024