Discover the SciOpen Platform and Achieve Your Research Goals with Ease.
Search articles, authors, keywords, DOl and etc.
This study investigates the bond failure mechanism between engineered cementitious composite (ECC) and corroded rebars through pull-out experiments. The effects of corrosion rate, bond anchorage length, rebar diameter, and fiber content on bond performance are analyzed. The results show that the bond stress-slip curve can be divided into: micro-slip, slip, failure and residual phases. All specimens exhibit shear pull-out failure as the primary failure mode. The bond strength initially increases and then decreases with the corrosion rate and there is a critical corrosion rate resulting in the warimized bond strength. For rebars with a 10% corrosion rate, bond strength decreases as anchorage length and rebar diameter increase. Additionally, increasing the fiber content enhances the bond toughness index and bond strength initially, followed by a decline. The optimum performance, including maximum toughness and crack resistance, is observed at a fiber content of 2%.
Comments on this article