AI Chat Paper
Note: Please note that the following content is generated by AMiner AI. SciOpen does not take any responsibility related to this content.
{{lang === 'zh_CN' ? '文章概述' : 'Summary'}}
{{lang === 'en_US' ? '中' : 'Eng'}}
Chat more with AI
PDF (2.5 MB)
Collect
AI Chat Paper
Show Outline
Outline
Show full outline
Hide outline
Outline
Show full outline
Hide outline
Publishing Language: Chinese

Integrated green job-shop scheduling considering AGV charging

Zhengfeng LI1( )Wenpeng GU1Guohui ZHANG2Gaofeng ZHOU1
School of Mechatronics Engineering, Zhongyuan University of Technology, Zhengzhou 450007, P. R. China
School of Management Engineering, Zhengzhou University of Aeronautics, Zhengzhou 450015, P. R. China
Show Author Information

Abstract

Automatic guided vehicles (AGVs) have become an important transport resources in modern job shops, yet their deployment introduces new scheduling challenges, such as AGV assignment, power constraints, and fleet size limitations. To address the green scheduling problem of job shops considering AGV charging requirements, this study develops a multi-objective optimization model that minimizes makespan and energy consumption while accounting for AGV power levels and charging behavior. An improved genetic algorithm is proposed to solve the model. It employs dual-segment chromosome encoding for job sequencing and AGV allocation, and local search strategies and dedicated genetic operators for each chromosome segment. A decoding mechanism considering AGV power and charging constraints is also designed. Through orthogonal simulation experiments using the FT06 benchmark case, the influence of AGV fleet size and battery capacity on scheduling performance are analyzed via range and variance methods. Simulation results demonstrate the effectiveness of the proposed model and algorithm.

CLC number: TP278;TP18 Document code: A Article ID: 1000-582X(2026)01-017-15

References

【1】
【1】
 
 
Journal of Chongqing University
Pages 17-31

{{item.num}}

Comments on this article

Go to comment

< Back to all reports

Review Status: {{reviewData.commendedNum}} Commended , {{reviewData.revisionRequiredNum}} Revision Required , {{reviewData.notCommendedNum}} Not Commended Under Peer Review

Review Comment

Close
Close
Cite this article:
LI Z, GU W, ZHANG G, et al. Integrated green job-shop scheduling considering AGV charging. Journal of Chongqing University, 2026, 49(1): 17-31. https://doi.org/10.11835/j.issn.1000-582X.2024.217

506

Views

19

Downloads

0

Crossref

0

Scopus

Received: 26 October 2023
Published: 11 July 2024
© Journal of Chongqing University