Research paper | Open Access

Prospect of comprehensive utilization of geothermal resources during the construction and operation of railway

Mingyu Lei1,2, Yanliang Li1,2( ), Fei Lv3, Dian Xiao1,2, Jialiang Liu1,2, Qing Yang1,2
China Academy of Railway Sciences Co., Ltd., Beijing, China
Sichuan-Tibet Technology Innovation Center (Chengdu) of National Railway Co., Ltd., Chengdu, China
Sichuan-Tibet Railway Technology Innovation Center Co., Ltd., Chengdu, China
Show Author Information

Abstract

Purpose

This study is dedicated to systematically collating the distribution and utilization circumstances of geothermal resources in China. Moreover, it endeavors to formulate a comprehensive utilization scheme for geothermal resources during the construction and operation phases of the railway, thereby furnishing robust support and valuable reference for the holistic utilization of geothermal resources along the railway corridor.

Design/methodology/approach

Through an in-depth analysis of the extant utilization of geothermal resources in China, it is discerned that the current utilization modalities are relatively rudimentary, bereft of rational planning and characterized by a low utilization rate. Concurrently, by integrating the practical requisites of railway construction and operation and conducting theoretical dissections, a comprehensive utilization plan for the construction and operation periods of railway is proffered.

Findings

In light of the railway’s construction and operation characteristics, geothermal utilization models are categorized. During construction, comprehensive modalities include tunnel illumination power generation, construction area heating, tunnel antifreeze using shallow geothermal energy, tunnel pavement antifreeze and construction concrete maintenance. During operation, they comprise operation tunnel antifreeze, railway roadbed antifreeze, railway switch snow melting and deicing, geothermal power station establishment and railway hot spring health tourism planning.

Originality/value

According to the characteristics and actual needs of railway construction and operation, it is of great significance to rationally utilize geothermal resources to promote the construction and operation of green railways.

References

【1】
【1】
 
 
Railway Sciences
Pages 249-265

{{item.num}}

Comments on this article

Go to comment

< Back to all reports

Review Status: {{reviewData.commendedNum}} Commended , {{reviewData.revisionRequiredNum}} Revision Required , {{reviewData.notCommendedNum}} Not Commended Under Peer Review

Review Comment

Close
Close
Cite this article:
Lei M, Li Y, Lv F, et al. Prospect of comprehensive utilization of geothermal resources during the construction and operation of railway. Railway Sciences, 2025, 4(2): 249-265. https://doi.org/10.1108/RS-12-2024-0054

611

Views

15

Downloads

0

Crossref

0

Scopus

Received: 26 December 2024
Revised: 31 December 2024
Accepted: 31 December 2024
Published: 01 April 2025
© Mingyu Lei, Yanliang Li, Fei Lv, Dian Xiao, Jialiang Liu and Qing Yang. Published in Railway Sciences.

This article is published under the Creative Commons Attribution (CC BY 4.0) licence. Anyone may reproduce, distribute, translate and create derivative works of this article (for both commercial and non-commercial purposes), subject to full attribution to the original publication and authors. The full terms of this licence may be seen at http://creativecommons.org/licences/by/4.0/legalcode