AI Chat Paper
Note: Please note that the following content is generated by AMiner AI. SciOpen does not take any responsibility related to this content.
{{lang === 'zh_CN' ? '文章概述' : 'Summary'}}
{{lang === 'en_US' ? '中' : 'Eng'}}
Chat more with AI
PDF (1.4 MB)
Collect
Submit Manuscript AI Chat Paper
Show Outline
Outline
Show full outline
Hide outline
Outline
Show full outline
Hide outline

Controlled Blasting Technology for Shallow-Buried Large-Section Tunnel below Susceptible Buildings in Coastal Stratum

China Railway 18th Bureau Group Co., Ltd., Tianjin, 300222, China
Show Author Information

Abstract

In order to solve the problem of blasting vibration generated by the drilling and blasting method of the land section of the urban submarine tunnel, which has a great impact on the safety of the surrounding building (structure) structure and the life of residents, this paper optimizes the blasting technology of the sensitive building (structure) section of the urban shallow buried tunnel under complex geological conditions through field tests and theoretical calculations. The paper proposes the protection and reinforcement scheme of the building (structure), the auxiliary measures for controlling blasting and the optimization scheme of the control blasting parameters, and verifies the design of the trenching of the guide hole, the gun hole and the hole layout. The analysis of the data from the field test shows that the use of digital electronic detonators, controlling the maximum charge, reducing the size of the excavation section, shortening the feed can significantly control the blast vibration of the surrounding buildings, combined with the "hollow hole + hollowing + wedge hollowing" plan and parameter optimization. In addition, when the tunnel crosses the surface buildings in close proximity, the grouting piles, isolation piles and grouting are installed between the affected area and the building foundation, which can play an obvious role in vibration and settlement control. It can be seen that the blasting scheme adopted can effectively control the tunnel blasting vibration speed within 0.5 cm/s, basically achieve sensorless blasting at the surface 10 m in front of the palm, and the surface blasting vibration speed monitor outside the palm 20 m in front of the palm has no trigger, which greatly reduces the impact of tunnel blasting construction on the surrounding environment and ensures the structural safety of the buildings (structures) around the tunnel.

References

【1】
【1】
 
 
Journal of Highway and Transportation Research and Development (English Edition)
Pages 43-52

{{item.num}}

Comments on this article

Go to comment

< Back to all reports

Review Status: {{reviewData.commendedNum}} Commended , {{reviewData.revisionRequiredNum}} Revision Required , {{reviewData.notCommendedNum}} Not Commended Under Peer Review

Review Comment

Close
Close
Cite this article:
Li G. Controlled Blasting Technology for Shallow-Buried Large-Section Tunnel below Susceptible Buildings in Coastal Stratum. Journal of Highway and Transportation Research and Development (English Edition), 2023, 17(1): 43-52. https://doi.org/10.1061/JHTRCQ.0000856

5

Views

0

Downloads

0

Crossref

Received: 11 May 2022
Published: 01 March 2023
© The Editorial Office of Journal of Highway and Transportation Research and Development (English Edition)