AI Chat Paper
Note: Please note that the following content is generated by AMiner AI. SciOpen does not take any responsibility related to this content.
{{lang === 'zh_CN' ? '文章概述' : 'Summary'}}
{{lang === 'en_US' ? '中' : 'Eng'}}
Chat more with AI
PDF (24.1 MB)
Collect
Submit Manuscript AI Chat Paper
Show Outline
Outline
Show full outline
Hide outline
Outline
Show full outline
Hide outline

Numerical Simulation and Stability Investigation on the Excavation Process of Multistage High Steep Slope

Bin Xu1,2( )Xinrong Liu1,2Xinlin Liu1,2Junhui Huang1,2Jingliang Zhang3
School of Civil Engineering, Chongqing University, Chongqing 400045, China
National Joint Engineering Research Center of Geohazards Prevention in the Reservoir Areas, Chongqing University, Chongqing 400045, China
Sinohydro Bureau 14 Co., Ltd, Yunnan Kunming 650041, China
Show Author Information

Abstract

Using UDEC discrete element method (DEM) and field monitoring method, the influence rules of slope height, slope angle and excavation stage on the stress field, displacement field and stability safety factor of high steep slope during excavation process were investigated. Research shows that: (1) The slope displacement and maximum principal stress gradually decrease and increase from the face (top) to the bottom of slope and from the middle (lower) part of the final excavation face to both sides of slope respectively, and the maximum displacement and stress increase and decrease with the increase of slope height (angle) respectively (decrease and basically remain unchanged with the increase of excavation stages respectively). (2) The curve of slope shoulder (top) displacement versus excavation times can be roughly divided into three development stages, i.e., the early stage of steep increase, the middle stage of gradual increase and the later stage of gentle decline (slope shoulder), gentle decline-steep increase or steep drop-slow increase (slope top). (3) Under the same slope height (angle) or excavation stages, the safety factor of slope stability first increases and then decreases with the increase of excavation times, and it decreases with the increase of slope height (angle) under the same excavation times (increases with the increase of excavation stages). (4) The results of numerical simulation reveal the real-time stress and deformation state of high steep slope in the process of multi-stage excavation, which is in good agreement with the field monitoring results. It is suggested that dynamic information design, construction and monitoring should be adopted for multi-stage high steep slope excavation engineering.

References

【1】
【1】
 
 
Journal of Highway and Transportation Research and Development (English Edition)
Pages 7-19

{{item.num}}

Comments on this article

Go to comment

< Back to all reports

Review Status: {{reviewData.commendedNum}} Commended , {{reviewData.revisionRequiredNum}} Revision Required , {{reviewData.notCommendedNum}} Not Commended Under Peer Review

Review Comment

Close
Close
Cite this article:
Xu B, Liu X, Liu X, et al. Numerical Simulation and Stability Investigation on the Excavation Process of Multistage High Steep Slope. Journal of Highway and Transportation Research and Development (English Edition), 2022, 16(3): 7-19. https://doi.org/10.1061/JHTRCQ.0000828

6

Views

1

Downloads

0

Crossref

Received: 07 July 2021
Published: 01 September 2022
© The Editorial Office of Journal of Highway and Transportation Research and Development (English Edition)