AI Chat Paper
Note: Please note that the following content is generated by AMiner AI. SciOpen does not take any responsibility related to this content.
{{lang === 'zh_CN' ? '文章概述' : 'Summary'}}
{{lang === 'en_US' ? '中' : 'Eng'}}
Chat more with AI
PDF (4.8 MB)
Collect
Submit Manuscript AI Chat Paper
Show Outline
Outline
Show full outline
Hide outline
Outline
Show full outline
Hide outline

Key Points of RIOHTRACK Testing Road Design and Construction

Xudong Wang1( )Guangli Zhou2Haiyan Liu2Qing Xiao3
Research Institute of Highway Ministry of Transport, Beijing 100088, China
China Road and Bridge Corporation, Beijing 100011, China
Jiangxi Provincial Expressway Investment Group Co., Ltd., Nanchang Jiangxi 330025, China
Show Author Information

Abstract

The technical orientation, pavement structure and material design scheme of the first full-scale test track (RIOHTRACK) in China, and the composition of the testing platform, including vehicle loading and data collection, etc., are introduced. RIOHTRACK has 19 kinds of designed pavement structure putting on the straight and transition curve, these pavement structures cover domestic and foreign engineering application cases, including flexible base course, semi-rigid base course and rigid base course, and different asphalt structural layers and material combination modes. The 19 kinds of pavement are classified according to the design idea and evaluation objective, and the design standard, verification objective, structure character and material technique requirement, etc. of each pavement structure are discussed separately. Using the multi-axle loading vehicle with a total weight of 100 t, the all-weather accelerated loading on the above typical pavement structures is conducted, and the performance of these pavement structures is quantified and compared. The result can be used for research of equivalent load conversion method, pavement damage prediction model, the method of structure and material optimal design, and maintenance technical standard.

References

【1】
【1】
 
 
Journal of Highway and Transportation Research and Development (English Edition)
Pages 1-16

{{item.num}}

Comments on this article

Go to comment

< Back to all reports

Review Status: {{reviewData.commendedNum}} Commended , {{reviewData.revisionRequiredNum}} Revision Required , {{reviewData.notCommendedNum}} Not Commended Under Peer Review

Review Comment

Close
Close
Cite this article:
Wang X, Zhou G, Liu H, et al. Key Points of RIOHTRACK Testing Road Design and Construction. Journal of Highway and Transportation Research and Development (English Edition), 2020, 14(4): 1-16. https://doi.org/10.1061/JHTRCQ.0000749

4

Views

0

Downloads

0

Crossref

Received: 15 July 2020
Published: 01 December 2020
© The Editorial Office of Journal of Highway and Transportation Research and Development (English Edition)