AI Chat Paper
Note: Please note that the following content is generated by AMiner AI. SciOpen does not take any responsibility related to this content.
{{lang === 'zh_CN' ? '文章概述' : 'Summary'}}
{{lang === 'en_US' ? '中' : 'Eng'}}
Chat more with AI
PDF (1.8 MB)
Collect
Submit Manuscript AI Chat Paper
Show Outline
Outline
Show full outline
Hide outline
Outline
Show full outline
Hide outline

Effect of Shield-Tunnel Excavation on Adjacent-Pile Foundation Based on Modified Cam-Clay Model

Yahui Wei1( )Yaqiong Wang1Yue Mao2Longlong Chen1Meng Wang3
School of Highway, Chang'an University, Xi'an Shaanxi 710064, China
CCCC Highway Consultants Co., Ltd., Beiing 100088, China
China Railway Tunnel Group Road and Bridge Engineering Co., Ltd., Tianjin 300000, China
Show Author Information

Abstract

To ensure the safety of shield tunneling near pile foundation and reduce the disturbance of this phenomenon in an urban metro in the loess area of China, a three-dimensional finite-element analysis model of shield-tunneling construction is established based on ABAQUS numerical simulation software and modified Cam-clay model. The deformation and ground settlement of adjacent-pile foundation during shield tunneling are analyzed. The law of descent is calculated and analyzed. Results show that the influence of tunnel shield on adjacent-pile foundation is primarily manifested in the X-direction displacement of the buried depth of the tunnel. During the shield-excavation process, the X-direction displacement of the pile increases gradually with decreased distance between the excavation face and the pile. When the distance between the pile axis and the excavation face of the tunnel is approximately[-0.5D, +0.5D], the displacement is the largest; when D continues to increase, the X-direction displacement is the largest. The displacement also continues to increase and eventually stabilizes. By obtaining the deformation curve of ground settlement, we find that the ground deformation is the largest above the tunnel axis and gradually decreases to both sides, whereas the pile cap is affected by uneven settlement. In the actual excavation of the tunnel project, strengthening the monitoring of the uneven settlement of the cap is necessary to take timely control measures.

References

【1】
【1】
 
 
Journal of Highway and Transportation Research and Development (English Edition)
Pages 84-92

{{item.num}}

Comments on this article

Go to comment

< Back to all reports

Review Status: {{reviewData.commendedNum}} Commended , {{reviewData.revisionRequiredNum}} Revision Required , {{reviewData.notCommendedNum}} Not Commended Under Peer Review

Review Comment

Close
Close
Cite this article:
Wei Y, Wang Y, Mao Y, et al. Effect of Shield-Tunnel Excavation on Adjacent-Pile Foundation Based on Modified Cam-Clay Model. Journal of Highway and Transportation Research and Development (English Edition), 2020, 14(2): 84-92. https://doi.org/10.1061/JHTRCQ.0000733

8

Views

1

Downloads

0

Crossref

Received: 11 November 2019
Published: 01 June 2020
© The Editorial Office of Journal of Highway and Transportation Research and Development (English Edition)