AI Chat Paper
Note: Please note that the following content is generated by AMiner AI. SciOpen does not take any responsibility related to this content.
{{lang === 'zh_CN' ? '文章概述' : 'Summary'}}
{{lang === 'en_US' ? '中' : 'Eng'}}
Chat more with AI
PDF (5.2 MB)
Collect
Submit Manuscript AI Chat Paper
Show Outline
Outline
Show full outline
Hide outline
Outline
Show full outline
Hide outline
Original Paper | Open Access

Study on the clogging mechanism of punching screen in sand control by the punching structure parameters

Fu-Cheng Denga( )Fu-Lin GuiaBai-Tao FanbLei WenaSheng-Hong ChencNing GongdYun-Chen XiaoaZhi-Hui Xua
Yangtze University, Jingzhou, 434023, Hubei, China
CNOOC Research Institute Ltd., Beijing, 100028, China
CNOOC Ener Tech-Drilling & Production Co., Tianjin, 300457, China
Tianjin Branch of CNOOC Ltd., Tianjin, 300459, China

Edited by Jia-Jia Fei

Show Author Information

Abstract

As an independent sand control unit or a common protective shell of a high-quality screen, the punching screen is the outermost sand retaining unit of the sand control pipe which is used in geothermal well or oil and gas well. However, most screens only consider the influence of the internal sand retaining medium parameters in the sand control performance design while ignoring the influence of the plugging of the punching screen on the overall sand retaining performance of the screen. To explore the clogging mechanism of the punching screen, this paper established the clogging mechanism calculation model of a single punching screen sand control unit by using the computational fluid mechanics-discrete element method (CFD-DEM) combined method. According to the combined motion of particles and fluids, the influence of the internal flow state on particle motion and accumulation was analyzed. The results showed that (1) the clogging process of the punching sand control unit is divided into three stages: initial clogging, aggravation of clogging and stability of clogging. In the initial stage of blockage, coarse particles form a loose bridge structure, and blockage often occurs preferentially at the streamline gathering place below chamfering inside the sand control unit. In the stage of blockage intensification, the particle mass develops into a relatively complete sand bridge, which develops from both ends of the opening to the center of the opening. In the stable plugging stage, the sand deposits show a “fan shape” and form a “V-shaped” gully inside the punching slot element. (2) Under a certain reservoir particle-size distribution, The slit length and opening height have a large influence on the permeability and blockage rate, while the slit width size has little influence on the permeability and blockage rate. The microscopic clogging mechanism and its law of the punching screen prevention unit are proposed in this study, which has some field guidance significance for the design of punching screen and sand prevention selection.

References

【1】
【1】
 
 
Petroleum Science
Pages 609-620

{{item.num}}

Comments on this article

Go to comment

< Back to all reports

Review Status: {{reviewData.commendedNum}} Commended , {{reviewData.revisionRequiredNum}} Revision Required , {{reviewData.notCommendedNum}} Not Commended Under Peer Review

Review Comment

Close
Close
Cite this article:
Deng F-C, Gui F-L, Fan B-T, et al. Study on the clogging mechanism of punching screen in sand control by the punching structure parameters. Petroleum Science, 2024, 21(1): 609-620. https://doi.org/10.1016/j.petsci.2023.08.017

474

Views

5

Downloads

8

Crossref

6

Web of Science

9

Scopus

1

CSCD

Received: 20 March 2023
Revised: 26 April 2023
Accepted: 16 August 2023
Published: 25 August 2023
© 2023 The Authors.

This is an open access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/).