AI Chat Paper
Note: Please note that the following content is generated by AMiner AI. SciOpen does not take any responsibility related to this content.
{{lang === 'zh_CN' ? '文章概述' : 'Summary'}}
{{lang === 'en_US' ? '中' : 'Eng'}}
Chat more with AI
PDF (3.5 MB)
Collect
Submit Manuscript AI Chat Paper
Show Outline
Outline
Show full outline
Hide outline
Outline
Show full outline
Hide outline
Original Paper | Open Access

Experimental study of the temporary plugging capability of diverters to block hydraulic fractures in high-temperature geothermal reservoirs

Dao-Bing Wanga, Hao Qinb, Yong-Liang Wangc, Jian-Qiao Hud, Dong-Liang Suna ( ), Bo Yua( )
School of Mechanical Engineering, Beijing Institute of Petrochemical Technology, Beijing, 102617, China
Jinan Branch, China Petroleum and Chemical Corporation, Jinan, 250101, Shandong, China
School of Mechanics and Civil Engineering, China University of Mining and Technology (Beijing), Beijing, 100083, China
LNM, Institute of Mechanics, Chinese Academy of Sciences, Beijing, 100190, China

Edited by Jia-Jia Fei

Show Author Information

Abstract

The effective plugging of artificial fractures is key to the success of temporary plugging and diverting fracturing technology, which is one of the most promising ways to improve the heat recovery efficiency of hot dry rock. At present, how temporary plugging agents plug artificial fractures under high temperature remains unclear. In this paper, by establishing an improved experimental system for the evaluation of temporary plugging performance at high temperature, we clarified the effects of high temperature, injection rate, and fracture width on the pressure response and plugging efficiency of the fracture. The results revealed that the temporary plugging process of artificial fractures in hot dry rock can be divided into four main stages: the initial stage of temporary plugging, the bridging stage of the particles, the plugging formation stage, and the high-pressure dense plugging stage. As the temperature increases, the distribution distance of the temporary plugging agent, the number of pressure fluctuations, and the time required for crack plugging increases. Particularly, when the temperature increases by 100 ℃, the complete plugging time increases by 90.7%.

References

【1】
【1】
 
 
Petroleum Science
Pages 3687-3699

{{item.num}}

Comments on this article

Go to comment

< Back to all reports

Review Status: {{reviewData.commendedNum}} Commended , {{reviewData.revisionRequiredNum}} Revision Required , {{reviewData.notCommendedNum}} Not Commended Under Peer Review

Review Comment

Close
Close
Cite this article:
Wang D-B, Qin H, Wang Y-L, et al. Experimental study of the temporary plugging capability of diverters to block hydraulic fractures in high-temperature geothermal reservoirs. Petroleum Science, 2023, 20(6): 3687-3699. https://doi.org/10.1016/j.petsci.2023.07.002

599

Views

4

Downloads

30

Crossref

28

Web of Science

31

Scopus

1

CSCD

Received: 04 January 2023
Revised: 20 March 2023
Accepted: 02 July 2023
Published: 03 July 2023
© 2023 The Authors.

This is an open access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/).