AI Chat Paper
Note: Please note that the following content is generated by AMiner AI. SciOpen does not take any responsibility related to this content.
{{lang === 'zh_CN' ? '文章概述' : 'Summary'}}
{{lang === 'en_US' ? '中' : 'Eng'}}
Chat more with AI
Article Link
Collect
Show Outline
Outline
Show full outline
Hide outline
Outline
Show full outline
Hide outline
Open Access

Aero-engine fleets scheduling optimization and task assignment under task-constraints

Xiangzhao XIAa,bXuyun FUb( )Shisheng ZHONGa,b
Department of Mechanical Engineering, Harbin Institute of Technology, Harbin 150000, China
Department of Mechanical Engineering, Harbin Institute of Technology at Weihai, Weihai 264209, China

Peer review under responsibility of Editorial Committee of CJA.

Show Author Information

Abstract

The scheduling optimization and task assignment of aero-engine fleets are complex and dynamic, presenting a significant challenge in aviation engineering. This study proposes a Dual-layer Collaborative Optimization Framework (DCOF) to address these challenges. The problem is decomposed into two interrelated sub-problems, scheduling optimization and task assignment, with distinct mathematical models formulated for each. For scheduling optimization, this study proposes an Improved Gravity Particle Swarm Optimization (IGPSO) algorithm. The algorithm enhances global search capability and convergence speed through dynamic weight adjustment and constraint processing repair strategies, effectively handling dynamic variations in engine health and remaining life. For task assignment, an Improved Branch-and-Price (IB&P) method is used. This method combines column generation with branch-and-bound strategies, while integrating heuristic rules and parallel computing techniques to efficiently find optimal solutions under multi-dimensional constraints. By clearly distinguishing between operational and maintenance tasks and considering their interdependencies, the proposed DCOF better captures real operational needs, improving fleet scheduling efficiency and reliability. Experimental validation and engineering simulations confirm the method’s effectiveness, showing advantages in repair balance, task assignment balance, and minimizing engine life waste. The approach enhances both usage efficiency and maintenance management of aero-engine fleets.

References

【1】
【1】
 
 
Chinese Journal of Aeronautics

{{item.num}}

Comments on this article

Go to comment

< Back to all reports

Review Status: {{reviewData.commendedNum}} Commended , {{reviewData.revisionRequiredNum}} Revision Required , {{reviewData.notCommendedNum}} Not Commended Under Peer Review

Review Comment

Close
Close
Cite this article:
XIA X, FU X, ZHONG S. Aero-engine fleets scheduling optimization and task assignment under task-constraints. Chinese Journal of Aeronautics, 2026, 39(6). https://doi.org/10.1016/j.cja.2025.104049

9

Views

0

Crossref

0

Web of Science

0

Scopus

0

CSCD

Received: 15 April 2025
Revised: 07 May 2025
Accepted: 16 July 2025
Published: 27 December 2025
© 2025 The Author(s). Chinese Society of Aeronautics and Astronautics.

This is an open access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/).