AI Chat Paper
Note: Please note that the following content is generated by AMiner AI. SciOpen does not take any responsibility related to this content.
{{lang === 'zh_CN' ? '文章概述' : 'Summary'}}
{{lang === 'en_US' ? '中' : 'Eng'}}
Chat more with AI
PDF (2.5 MB)
Collect
Submit Manuscript AI Chat Paper
Show Outline
Outline
Show full outline
Hide outline
Outline
Show full outline
Hide outline

Construction Management Utilizing 4D CAD and Operations Simulation Methodologies

Jianping ZHANG( )Yang ZHANGZhenzhong HUMing LU
Department of Civil Engineering, Tsinghua University, Beijing 100084, China
Department of Civil and Structural Engineering, The Hong Kong Polytechnic University, Hong Kong, China
Show Author Information

Abstract

The paper presents applications of simplified discrete-event simulation (SDESA), and 4D-GCPSU, to the National Stadium of the Beijing 2008 Olympics. Taking into account influential factors, e.g., resource, spatial condition, and the randomness of the construction process, the installation process of the steel-structure was simulated and optimized by using genetic algorithm (GA) optimization methodology. The operations simulation shortened the installation duration by 39 days (about 16% of the original total duration), guided the manufacturers to plan the construction processes, and provided specific suggestions on the entry time of the installation components, resulting in resource allocation optimization, resource saving, and construction efficiency improvement. Combining with the optimized schedule, the 4D visualization environment can discover time-space conflicts timely, and may assist project managers to reschedule the construction activities in tune with the site layout and resource allocation.

References

【1】
【1】
 
 
Tsinghua Science and Technology
Pages 241-247

{{item.num}}

Comments on this article

Go to comment

< Back to all reports

Review Status: {{reviewData.commendedNum}} Commended , {{reviewData.revisionRequiredNum}} Revision Required , {{reviewData.notCommendedNum}} Not Commended Under Peer Review

Review Comment

Close
Close
Cite this article:
ZHANG J, ZHANG Y, HU Z, et al. Construction Management Utilizing 4D CAD and Operations Simulation Methodologies. Tsinghua Science and Technology, 2008, 13(S1): 241-247. https://doi.org/10.1016/S1007-0214(08)70156-1

1

Views

0

Downloads

0

Crossref

0

Web of Science

0

Scopus

0

CSCD

Received: 30 May 2008
Published: 15 July 2026
© Tsinghua University Press 2008